10
6.
MOUNTING THE TOWBAR
Proceed as follows to mount the tow bar:
6.1-
Insert the tow bar
A
onto the fixed frame as illustrated in the picture.
6.2-
Fasten it onto the frame by using screws
B
and bolts
C
.
7.
ATTACHING AND DETACHING THE UNIT CARRIER FRAME
Proceed as follows to attach the unit carrier frame:
7.1-
The tractor must be switched off with the service brake on.
7.2-
The tractor must be on solid and level ground.
7.3-
Check that the tow bar is fixed properly onto the fixed frame (see
mounting the tow bar).
7.4-
Move the tractor closer and attach it to the fixed frame with the tow bar.
7.5-
Mount pivots
“
A
” and ball joints “
B
” in the upper hole as shown in Fig.3
(Warning!
Check that spacer
“C” is positioned as in Fig.3).
7.6-
Attach the oil inserts of the towing frame to the appropriate inserts
present on the tractor.
7.7-
Connect the unit carrier frame to the lift of the towing frame by
mounting tie rod
“
D
” inserting pivots “
E
”, block quick couplings “
F
” Fig.4
7.8-
Lift supporting foot
“
G
”.
Proceed as follows to detach the unit carrier frame:
7.1.1-
The tractor must be switched off with the service brake on.
7.1.2-
The tractor must be on solid and level ground.
7.1.3-
Bring the tractor close and by using the tow bar, connect it onto the
fixed frame.
7.1.4-
Lower supporting foot
“
G
”.
7.1.5-
Lower unit carrier frame.
7.1.6-
Remove the pivot
“
E
”, unblock the quick couplings “
F
”.
A
B
B
C
C
Содержание 998963
Страница 1: ...1 Use and Maintenance Manual Code 998963 4 Edition 08 2018 Language English TRAILER WITH WATER TANK...
Страница 4: ...4...
Страница 5: ...5...
Страница 7: ...7 Frame towed with one barrel Frame towed with two barrels...
Страница 11: ...11 E Fig 3 2 Fig 4 2 G C B A E D E F C B A...
Страница 19: ...19...
Страница 20: ...20...