DATA CARD ACCEPTANCE TESTS

Use the following procedures to verify data cards after all the previous T1 unit acceptance testing (electrical con-

nections, system turn-up, control verification and system alarms) has been completed.

7.1

ISDN Card Acceptance Test

Step

Action

System Response

1.

Make sure that the ICB is turned up and operating.

2.

Insert the ISDN card into the appropriate slot of

the ICB.

3.

Enable the NMS or craft interface and verify the

chassis/card configuration with a system that has

been reset to the factory default.

Verify the ISDN card is recognized in the proper

chassis slot and the configuration is 2B+D and

LULT.

4.

Perform a software near-end line T1 loop back.

LOS and ALM LEDs should illuminate on the ISDN

unit.

5.

Connect a test cable to the rear connector of the

full size ISDN card (front connector for a half size

ISDN card) and connect an ISDN NT1 test set (i.e.

TPI 550B) to one of the tip/ring pairs.

Verify that the LOS and ALM LEDs turn “off”  and

that no bit errors occur on the test set for the chan-

nel being tested.

6.

Release the T1 loopback.

ISDN card acceptance test is complete.

7.2

DSU Card Acceptance Test

Step

Action

System Response

1.

Make sure that the ICB is turned up and operating.

2.

Insert the DSU card into the appropriate slot of the

ICB.

3.

Enable the NMS or craft interface and verify the

chassis/card configuration with a system that has

been reset to the factory default.

Verify the DSU card is recognized in the proper

chassis slot and the configuration is V.35, and that

the data rate is 64K.

4.

Under DSU settings, enable the latching loopback

option for one channel. Then under the loopback

menu (listed under T1 settings for VT100 craft ter-

minal), perform a DSU near-end latching loopback

with a 2047 test pattern enabled.

Display should show “Map 0” with zero bit errors.

5.

Enter an “R” for release loopback if using a craft

terminal interface. The GUI interface will automati-

cally release loopback after 1 minute.

DSU loopback is removed.

7.3

64XN Card Acceptance Test

Step

Action

System Response

1.

Make sure that the ICB is turned up and operating.

2.

Insert the 64xN card into the appropriate slot of

the ICB.

3.

Enable the NMS or craft interface and verify the

chassis/card configuration with a system that has

been reset to the factory default.

Verify the 64xN card is recognized in the proper

chassis slot and that the configuration is time slot

length of 2, V.35 and the data rate is 64K.

4.

Perform a software near-end line T1 loop back.

No system alarms.

Содержание 360-80

Страница 1: ...echnical specifications herein subject to change without notice Page 1 of 9 360 80 Intelligent Channel Bank Turn Up and Acceptance Test Procedure CONTENTS PAGE Part 1 GENERAL 2 Part 2 VERIFYING ELECTR...

Страница 2: ...the Shelf documentation for the proper procedure Figure 1 displays the shelf rear panel 2 Apply power to the shelf 3 Locate the power terminal block on the rear see Figure 1 of the ICB Using a voltmet...

Страница 3: ...ID PWR Figure 2 T1 Controller Unit Front Panel 4 CONTROL VERIFICATION To get the information displayed as shown the control verification tests should be done with alarms active Control verification is...

Страница 4: ...th the NMS software installed con nect the ethernet from the PC to the network con trol terminal J2 on the rear of the T1 S 3 Activate the NMS software on the PC The NMS may start with the window mini...

Страница 5: ...rms exist 2 Release the T1 loopback Verify that there are visual and audible alarms 3 View the alarm status on the craft terminal and or NMS Display should show the correct alarm status 4 Press the AC...

Страница 6: ...nd the first time boot up configuration is FXO LS 4 For a full size FXO connect a test cable from a telephone CO switch or telephone line simulator to one of the TIP RING pairs on the rear connec tor...

Страница 7: ...st Step Action System Response 1 Make sure that the ICB is turned up and operating 2 Insert the DSU card into the appropriate slot of the ICB 3 Enable the NMS or craft interface and verify the chassis...

Страница 8: ...loopback menu listed under T1 settings for VT100 craft ter minal perform an OCU near end latching loop back with 2047 test pattern enabled Display should show Map 1 with zero bit errors Loopback LED t...

Страница 9: ...enter admin 11 Enter the following ip ping 192 168 0 1 Verify that the ping is returned 8 TECHNICAL ASSISTANCE If technical assistance is required contact Charles Industries Technical Services Center...

Отзывы: