100326-1 - 25 TON FULL BEAM LOg SPLiTTER
ASSEMBLY
16
4) install the Support Leg
Insert the support leg (60) into the leg holder on the tow bar and
secure with pin (57) and R-pin (56).
57
56
60
5) install the Beam
Stand the beam (1) vertical on the foot plate.
1. Roll the tank into position so the pivot holes of the tank and
beam are aligned.
2. Insert the bolt (29) and secure it with the washers (31), (32)
and lock nut (33).
3. Tighten the lock nut (33) onto the bolt (29).
1
31
32
33
29
NOTiCE
The bolt (29) should slide with little resistance in the slotted
hole
–
When in the vertical position, the bolt should be at the rear/
bottom of the slotted hole (see Fig. A)
–
When in the horizontal position, the bolt should be at the
front/top of the slotted hole (see Fig. B)
If the bolt does not slide to the correct position when the beam
is transitioned, loosen the nut in half turn increments until it
does.
Fig A
Fig B
4. Pivot the beam to the horizontal position and secure it with
the lock pin (54) and R-clip (56) through the tow bar.
54
56
WARNiNg
The beam is extremely heavy and should only be handled
with 2 or more people. DO NOT try and lift or handle the beam
without assistance.
6) install the Engine and Hoses
1. Place the engine on the engine mounting platform with the
recoil cover facing outward towards the wheel and align
the 4 holes on the engine base with the holes in the engine
platform.