100868 - LOAD MANAgEMENT MODULE
INSTALLATION
10
3. Connect the L1 and L2 Line to the top of the
contactor relay (LINE connections).
4. Connect the L1 and L2 lines to the bottom of
the contactor relay (LOAD connections).
5. Connect the ground to the ground terminal.
6. Max. Torque Line, Load Terminals and Ground
Terminal to 25 in. lbs. (2.8 N-m).