15
ON/OFF SWITCH POWER WIRING
NOTE:
Before running power wiring refer to wiring specifications
on page 14 for correct wire gauges.
Secure all electrical power connections inside the disconnect
switch electrical box. Refer to electrical wiring diagram on page 30.
STOP/RESET BUTTON CONTROL WIRING (REQUIRED)
1. This control will function as a Stop/Reset command and is to
be wired within line of sight of the gate.
The operator will not
function unless this circuit is completed.
2. Wire control station to terminals 3 and 5 in the control box on
the operator.
FIELD WIRING TERMINALS
STOP/RESET
Button
Control Conduit
STOP/RESET
STOP/RESET BUTTON WIRING
R1
R2
R3
R4
3
5
W I R I N G
SINGLE PHASE
All single phase operators will have the following:
115V
208/230V
• L1 (NEUTRAL), WHITE
• L1 (HOT), BLACK
• L2 (HOT), BLACK
• L2 (HOT), BLACK
• GROUND, GREEN
• GROUND, GREEN
Wire Nut Connections
(See Instructions)
ON/OFF Switch
Cover
Power Wiring Conduit
Содержание LiftMaster Professional SW420
Страница 35: ...35 O P E R AT O R N O T E S ...