6
ASSEMBLY STEP 1
Attach the Rail to the Motor Unit
To avoid installation difficulties, do not run the garage door
opener until instructed to do so.
• Remove the two washered bolts mounted on top of motor unit.
• Align rail and styrofoam over belt pulley. Cut tape from rail,
chain and styrofoam.
•
REMOVE STYROFOAM.
• Insert both washered bolts through the rail into the motor unit.
Tighten bolts securely.
Use only these bolts! Use of any other bolts will cause
serious damage to door opener.
• Position belt over the motor unit belt pulley.
To avoid SERIOUS damage to opener, ONLY use bolts
mounted in top of motor unit.
ASSEMBLY STEP 2
Set the Belt Tension
• By hand, thread the spring trolley nut on the threaded shaft
until it is finger tight against the trolley (Figure 1). Do not use
any tools.
• Insert a screwdriver tip into one of the nut ring slots and brace
it firmly against the trolley (Figure 2).
• Place a 7/16" open end wrench on the square end. Rotate
about 1/4 turn until the spring releases and snaps the nut ring
against the trolley (Figure 3).
This extends the spring for optimum belt tension.
Washered Bolt
5/16"-18x1/2"
Rail Hole
Motor Unit
Belt Pulley
Rail Hole
USE ONLY THIS
TYPE AND SIZE
BOLT
Trolley
Threaded
Shaft
Spring/Trolley Nut
Nut
Ring
Trolley
Threaded
Shaft
Nut Ring
Slots
Square
End
Nut Ring
Trolley
Nut Ring
Trolley
1" (2.5 cm)
1-1/4" (3.18 cm)
BEFORE
AFTER RELEASE
Figure 1
Figure 2
Figure 3
Содержание LiftMaster Elite Security+ 3850
Страница 39: ...39 NOTES ...