Model CL16
Installation, Operation and Maintenance
Page
8
Rev. 08/24/2021
CL16-IOM-A.doc
STANDARD
6" REDUCED (-6")
12" REDUCED (-12")
STANDARD
6" REDUCED (-6")
12" REDUCED (-12")
STANDARD
6" REDUCED (-6")
12" REDUCED (-12")
STANDARD
6" REDUCED (-6")
12" REDUCED (-12")
Fig. 10 – Cable Attachment At The Carriage
30) Mount synchronizer cables to carriages as
shown in
Fig. 10
.
Note: Use the proper Take-
Up Tube as shown in Fig 10 based on the
width of the lift.
H
YDRAULICS
IMPORTANT: To ensure proper hose fitting seal
without damage to the fitting follow this
procedure for each hose connection:
Screw flared
fitting on finger tight. Rotate flared fitting 1 1/2 hex
flats (90 deg.). Back the flared fitting off one full turn.
Again tighten flared fitting finger tight, then rotate
flared fitting 1 1/2 hex flats (90 deg.).
31) Mount Power Unit to power column as shown in
Fig 11
. The mounting hardware, (4) 5/16”-18NC
hex nuts, are pre-installed on power unit
mounting bracket.
Fig. 11 – Power Unit Mounting
32) Install 9/16”-18 O-ring elbow (
in hardware box
) into
power unit,
Fig. 11
.
CAUTION
do not damage
rubber O-ring.
33) Install the block hose clamp bracket onto both
column extensions using 1/4”-20NC x 3/4” lg.
hex flange bolt and nut, see
Fig 12
.