8
Menu - 3 - Boiler options
DISPLAY
ACTION
CONFIGURATION
Section
Digit
Digit
1
2 and 3
Under floor heating system
0
0 : no
1 : yes
DHW Delay
5
0 to 5 mn by step 0.5mn
(time before CH relight after a DHW cycle)
DHW flow swith Delay
6
0 to 20 1/10 seconde
(time before DHW flow detection to
override pressure peak problem)
F
actor
y
setting
once
x times
Menu - 4 - Boiler settings
Section
Digit
Digit
1
2 and 3
Room thermostat operation
0
0 : Burner only
0
1 : Burner and pump
Pump speed
1
0 : High speed
1
1 : Low speed
Pump post circulation duration
2
0.0 min
From 0 to 5 minutes by step of 0.5 min.
2
0,5 min
2
1.0 min
2
5.0 min
Maximum Central Heating flow temperature
4
50°C
4
80°C
C.H. anti-cycling delay
8
0.0 min
From 0 to 7 minutes by step of 0.5 min.
8
0.5 min
8
2.5 min
8
5.0 min
C.H. maximum output limitation
Model 24
From step 0 (P. min.) 8 kW
Value from
to step 10 (P. max.) 24 kW
9
0 to 10
Model 30
From step 0 (P. min.) 9 kW
Value from
to step 10 (P. max.) 28 kW
9
0 to 10
F
actor
y
setting
DISPLAY
ACTION
CONFIGURATION
once
x times