2-33
Touch and Go Landings
52.
Under certain conditions, it may be operationally advantageous to conduct touch and go
landings. When executing touch and go landings, the PIC shall ensure:
a.
the runway is 2000’ or longer;
b.
the aircraft is fully reconfigured by completing the Stop & Go checklist during the
landing roll; and
c.
there is a minimum of 1500’ of runway remaining when the “go” is initiated.
CAUTION
Performing continuous circuits on runways less than
3000’ requires a high level of landing accuracy. Pilots
must be prepared to abort a planned Stop & Go or
Touch & Go landing by either over-shooting, or fully
stopping and taxiing back to the normal take-off point.
POST LANDING CHECK
53.
Upon termination of a flight, and when clear of the runway, complete the post-landing
check as follows:
POST LANDING
ACTION
CHECK
NOTES
1. Flaps
Select UP
2. Cowl Flaps
OPEN
3. Transponder
OFF
4. Pitot Heat
OFF
Figure 2-24 Post Landing Check
Содержание 182
Страница 2: ......
Страница 57: ...1 39 Figure 1 47 Electrical Schematic ...
Страница 76: ...1 58 This page intentionally left blank ...
Страница 124: ...2 48 This page intentionally left blank ...
Страница 140: ...3 16 This page intentionally left blank ...