15
Figure 3.9. Removing the Battery Protection Plate
3.
Pull the battery tray out using the plastic tabs and then remove the
battery tray.(see Figure 3.10)
Figure 3.10: Removing the Battery Packs
4.
Install the UPS and
terminal box
’s ears to the UPS
Figure 3.11: Install the UPS and terminal box’s ears to the UPS
5.
Select the proper holes in the rail for positioning the cabinet in the
desired location in the rack. Locate the rails at the bottom of the 3U
space allocated for the each UPS and EBM.
6.
Install the sliding rails in the rack, then install the UPS in the sliding
rail.
Содержание PowerControl C500R-060-B UPS
Страница 31: ...28 Figure 4 5 and ensure all breakers are open ...
Страница 41: ...38 Figure 5 7 HE mode ...
Страница 48: ...45 Figure 5 14 Main menu tree ...
Страница 56: ...53 Figure 5 19 Setting menu tree ...