13
3. Once all of the EBMs have been successfully connected
to the UPS and the front panel has been reassembled
correctly, the UPS needs to be configured to recognise
the number of EBMs that have been installed. To do this,
refer to the instructions on page 16.
4. After installing and configuring the UPS to recognise the
EBMs, the protected equipment can then be reconnected
to the UPS. Please make sure the load equipment is
turned off before connecting all loads into the output C13
ports.
3.2 Connecting Multiple EBMs in Rack Mounted
Configuration
Connecting EBMs in rack form will take up additional rack
space. Please ensure that you have adequate room within the
rack prior to installation.
Please Note:
Remember to disconnect the protected
equipment and power down the UPS before installing any
EBMs. This will prevent damage to the equipment and reduce
the chance of electrical shock.
Содержание C300R
Страница 2: ......