
18
FIG. 14 – ASSEMBLY OF DBG-Y
CLAMPING
DEVICE
DBG-Y Clamping device
Rail drill front plate
35
FIG. 15 – ASSEMBLY OF POSITIONING SHOES
7.3) Assembly of positioning shoes
(Ref. to Fig. 15)
7.3.1)
The type
MPAF
.. and
MPAU
positioning shoes are secured to the front plate (22) of the drill
by means of the two socket head cap screws
M 6x16
supplied.
screws M6x16
MPAF...
MPAU
reference pin
22