![Cedarshed Montrose Shingle Roof Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/cedarshed/montrose-shingle-roof/montrose-shingle-roof_instructions-manual_2578734007.webp)
MONTROSE WALLS
Step 5: Screw wall panels together using 75mm
tek screws (3 per standard join, 4 per gable join),
ensuring end wall panels are inside side wall pan-
els as per wall plan.
Step 6: Silicone edge of weatherboards on stand-
ing panel and nail on cedar beads with 5 x bead
nails. (Refer to wall plan for correct beads).
Make sure bead is properly sealed to avoid leaks.
Note: On standard beads only, top of bead is bev-
elled to allow for slope of roof.
Step 7: Silicone and nail remaining beads on each
panel. Screw panels together using 3 tek Screws
per join and 4 on the longer joins on gable end
panels.
PG 6
Содержание Montrose Shingle Roof
Страница 1: ...CEDARSHED INSTRUCTIONS MONTROSE SHINGLE ROOF Base size 3000mm x 2490mm deep ...
Страница 13: ...MONTROSE Your shed is now complete You may protect Cedar by staining cedar weatherboards if required PG 12 ...
Страница 15: ......
Страница 16: ......