Step 24: Nail barge boards to ends of
purlins, using 50mm bead nails. (1 nail
per purlin).
Nail diamonds to barges with 2 x
50mm bead nails.
Step 21: Slide roof soakers in position
on all joints, starting at the bottom row
of shingles and working up.
Step 22: Nail using 50mm nails, above
the bottom of the next row of shingles.
Step 23: Remove temporary timber
spacer between front and back walls.