87
Fig. 41.2
Fig. 41.3
Step 41: Assemble Slide Supports
Part 2
C:
Dig a hole, flat bottom, 8” wide by 6-1/2” deep holes as shown in fig. 41.2. Place Slide Support
Assembly in hole, making sure that it is level and align flush inside edge of (2770) End Post Left. Drill 1/8” pilot
hole and attach to fort with 1 (LS3) 1/4 x 3” Lag Screw (with flat washer). (fig. 41.2 and 41.3)
D:
Refill hole #1 halfway with soil and compact making sure (0727) SL Support stays level with fort.
Finish filling and compacting. (fig. 41.2)
Warning! Digging can be dangerous if you do not check first
for underground wiring, cables or gas lines.
Note: Pre-drill all pilot holes using a 1/8”
drill bit before installing the lag screws.
Hardware
1 x
1/4 x 3” Lag Screw
(1/4” flat washer)
LS3
0727
Slide Support Assembly
2770
0728
FW1
LS3
Flush to inside
edge of (2770)
Ø8”
6-1/2”
Содержание Sedona F25035
Страница 92: ...92 support cedarsummitplay com NOTES NOTES ...
Страница 93: ...93 support cedarsummitplay com NOTES NOTES ...
Страница 94: ...94 support cedarsummitplay com NOTES NOTES ...