29
The following adjustments are available when “ON” is se-
lected:
MIN
MAX
DEF.
Start current
10%
200%
135%
Starting current time
0.1 s
10 s
0.5 s
Slope time
0.1 s
10 s
0.5 s
The welding process starts with the
“Start Current
”.The
time duration of this first current is controlled by the “
start-
ing current time”
. After this stage the current connects to
the welding current according to
”Slope Time”
.
7.1.10
”CRA”
“Final crater filler”
.
(only in synergic MIG 2T or 4T processes).
OFF (preset)
ON
The following adjustments are available when “ON” is se-
lected:
MIN
MAX
DEF.
Slope time
0.1 s
10 s
0.5 s
Crater Current
10%
200%
60%
Crater Current Time
0.1 s
10 s
0.5 s
7.1.11
“Soft Start”
.
(only in MIG/MAG processes)
It is the wire speed, expressed as a percentage of the
speed set for the welding, before the wire touches the
workpiece.
MIN
MAX
DEF.
Soft Start
1%
100%
Auto.
7.1.12
“Burnback”
.
(only in MIG/MAG processes)
Serves to adjust the length of the wire leaving the contact
tip after welding.
MIN
MAX
DEF.
Reg Burnback
4 ms
250 ms Auto.
7.1.13
“Double Level”
Art. 233 (optional)
(only in syner-
gic MIG/MAG processes).
This type of welding varies the intensity between two lev-
els
.
Before setting the double level welding, it is necessary to
make a short bead to determine the wire speed and the
current to obtain the penetration and the bead width clos-
est to the type of welding to be made.
The wire feed speed is thus determined (and the corre-
sponding current); the meters per minute that will be set
will be alternatively added to and subtracted from this
value.
Before start working you should not forget that for a cor-
rect bead, the minimum overlapping between two “mesh-
es” must be 50%.
OFF (preset)
ON.
The following adjustments are available when “ON” is se-
lected:
MIN
MAX
PRED.
Frequency
0.1 Hz
5 Hz
1.5 Hz
Pulse step
0.1 m
3 m
1 m
Duty cycle
25%
75%
50%
Arc correction
-9.9
9.9
0
7.1.13.1
“Frequency”
of double level.
The Herz frequency is the number of periods per second.
Period means the speed alternating from the higher to
the lower values.
The lower value, that does not penetrate, is used by the op-
erator to change from one mesh to the next one; the higher
speed, corresponding to the maximum current, is the pen-
etrating speed; the operator will stop to make the mesh.
7.1.13.2
“Pulse Step“
:
it is the amplitude of the speed
change in/min.
The speed change determines the sum and the the sub-
traction of m/min from the reference speed described
above. Parameters being the same, when the number in-
creases the mesh is wider and penetration is deeper.
7.1.13.3
“Duty cycle”
:
double level time.
Expressed as a percentage, this is the higher speed/cur-
rent time as compared to period duration. Parameters be-
ing the same, it determines the mesh diameter and there-
fore the penetration.
7.1.13.4
“Arc Length Cor”
.
Sets arc length of the higher speed/current.
Warning:
make sure that the arc length is the same for
both currents.
7.1.14
"Double Pulse"
.
It starts automatically when the two Art. 231 and Art. 233
are purchased.
See paragraph 7.1.13 for operation.
7.1.15
“Preflow”
.
(In all processes except MMA).
MIN
MAX
DEF.
Pre Gas
0 s
10 s
0.1 s
7.1.16
“Postflow”
.
(In all processes except MMA).
MIN
MAX
DEF.
Postflow
0 s
10 s
3 s
Содержание EVO SPEED STAR 380 TC
Страница 87: ...87...
Страница 139: ...139...
Страница 179: ...179 ZMAX 0 090 A 318 319 0 051 A 320 ZMAX 0 090 A 318 319 0 051 A 320 3 3 1 1 1 3 2 2 2 3 3 3 3 BA BB 4 4 BA BB...
Страница 180: ...180 5 5 BA 6 6 7 7 3 4 F 8 8 BN BN CA CA BN CA BN D G 3 5 A 1683 ANT 318 319 9...
Страница 181: ...181 9 M 3 6 3 6 1 3 7 IEC CEI EN 60974 9 G E F M B A D Q R H N T V S U W V Fig 10 L...
Страница 195: ...195 Art 318...
Страница 196: ...196 Art 319...
Страница 197: ...197 Art 319...
Страница 198: ...198 Art 320...
Страница 199: ...199 Art 320...
Страница 201: ...201 Art 318...
Страница 203: ...203 Art 319...
Страница 205: ...205 Art 320...
Страница 207: ...207 Art 319 320...
Страница 211: ...211...