CEBIEN UP-I Скачать руководство пользователя страница 4

Fix the lower 2 points with screw bolts.

Match product body to upper 2 holes on ‘A’ spot and check level

Hot

 Cold

Connect hose 

Connect each flexible pressure hose
(from the product body) to stop valves with hand first

With using spanner, fasten them tightly
(Careful for flexible hoses not to be folded) 

● Blue marked water pressure hose:

     connect to stop valve for cold water

● Red marked water pressure hose: 

     connect to stop valve for hot water

Unlock the stop valves with using flat-head screw driver
(un-clock wise) to open the valve. Make sure to check level 

Mount body

Insert 2 screw bolt in the upper 2 holes of product body and fix it

Make sure to check level 

Use spirit level 

Procedure of anchor bolts-fixing 

Design cap – Screw bolt – Insert cap – Nylon anchor 

Finish it with design cap

Содержание UP-I

Страница 1: ...in accordance with the Water Saving Regulations according to the Water Saving Law of the Environmental Ministry in Korea The installation drawings may be partially different from the actual appearanc...

Страница 2: ...posal without following installation instruction Installation procedure Tile finishing Make hole on tile and mount stop valve Install product body pipe slide bar multi pocket Assemble shower head hand...

Страница 3: ...e on 6 points of A use spirit level 6 5mm drill bit depth 50mm make hole on 6 points of A make hole on 6 points of A 1 Unlock the stop valves with using flat head screw driver un clockwise and allow t...

Страница 4: ...be folded Blue marked water pressure hose connect to stop valve for cold water Red marked water pressure hose connect to stop valve for hot water Unlock the stop valves with using flat head screw driv...

Страница 5: ...1 Connect pipe c to b 2 Adjust the height of upper pipe c for user 3 Connect the assembled pipe with product body Fasten pipe adapter not to leak out water...

Страница 6: ...the wall with using plus head screw driver 2 Put on side covers Connect shower head with upper pipe 1 Assemble shower hose h with product body Insert rubber o ring in the shower hose 2 Assemble hand...

Страница 7: ...slide bar on the wall with screw bolt 1 Assemble shower hose h with product body Insert rubber o ring in the shower hose 2 Assemble hand shower to shower hose on the other side Check all the function...

Страница 8: ...om the head shower orconnection part Is the hand shower securely assembled Is the shower hose connected to the main unit securely fastened Please fully tighten the head to the right Is the rubber ring...

Страница 9: ...unction please refer tothe service manual before requesting visit repair service Visit repair service is subject to charge If repair is not possible it shall be subject to the separate policy Simple c...

Отзывы: