
UP-I / UP-IS
Quick installation drawing
Carefully read the installation drawings & procedures and do installation.
Manufacturer or distributors will not be responsible for malfunction if you install
products at your disposal without following installation instruction.
Installation procedure
Tile finishing
Make hole on tile and mount stop valve
Install product(body/pipe/slide bar/multi pocket)
Assemble shower head/hand shower
Inspect product’s performance
Use spirit level
Hot
Cold
Hot
Hot
Cold
Cold
Stop valves direction to 7 o’clock
Pipe connection
(Red hose is for hot water)
Drilling with nylon anchor and screw
Assembling screws