CARVIN
®
PLATINUM SERIES OVAL POOL | USER MANUAL
14
FASTENING THE LINER ON TO THE POOL WALL
FOR ASSEMBLY WITH A U/J TYPE POOL LINER
STEP 1
The top of the liner has a welded vinyl
fl
ange to hang the liner. It is called an overlap.
Open it with your
fi
ngers and hang on the top of the wall.
Top rail
Pool wall
Liner
Exterior
Interior
STEP 3
As you install and hang the overlap liner, assemble the top rails to solidify the pool.
Position these top rails to be aligned with the bottom rails because the uprights will
have to be installed in top and bottom plates which are the junction between rails.
You might need a rubber mallet to place the upper rails in position and properly lock
the liner in place.
Do not cut the excess liner on the outside of the wall of the pool. If disassembly
or reassembly is necessary, a liner that has been cut will be much more
di
ffi
cult to position. If the excess liner is too long, simply fold it and fasten it
with tape.
STRUCTURE ASSEMBLY
INSTALLING THE TOP PLATES - ROUND SECTIONS
STEP 1
Tilt the top plate so that the inside part hooks onto the top rail. Then, lower the top
plate to press down against the upright.
STEP 2
Hang the liner on the wall all around the pool. The liner should be free of any wrin-
kles or creases on the vertical portion on the walls. If this is the case, adjust the liner
by turning the bottom of the liner, or by adjusting the overlap on the wall contour.
STEP 2
Make sure the holes on top plates are aligned with the holes on top of uprights.
Install the 4 auto tapping screws (14455032) to assemble the top plates on the
uprights.
P/N. 14455032
SCREW AT LOW SPEED
Max torque 4 N·m (35 in·lbf)
PH3