Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53500216-01
Printed in U.S.A.
Form 50TCQ-8-12-01SI
Pg CL-1
1-19
Replaces: 50TCQ-8-9-03SI, 50TCQ-12-02SI
START-UP CHECKLIST
(Remove and use for job file)
I. PRELIMINARY INFORMATION
MODEL NO ____________________________________________
JOB NAME _____________________________________________
SERIAL NO ____________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify installation of flue exhaust and inlet hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor-air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
L1-L2_____________
L2-L3_____________
L3-L1_____________
Compressor Amps 1
L1 _____________
L2 _____________
L3 _____________
Compressor Amps 2
L1 _____________
L2 _____________
L3 _____________
Supply Fan Amps
L1 _____________
L2 _____________
L3 _____________
TEMPERATURES
Outdoor-air Temperature
_____________ °F DB (Dry Bulb)
Return-air Temperature
_____________ °F DB
_____________
°
F WB (Wet Bulb)
Cooling Supply Air Temperature
_____________ °F
PRESSURES
Refrigerant Suction
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
Refrigerant Discharge
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
Verify Refrigerant Charge using Charging Charts (Y/N) _____
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation Instructions document.
Содержание WeatherMaker 50TCQ*08
Страница 4: ...4 Fig 2 Unit Dimensional Drawing 08 and 09 Size Units ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing 08 and 09 Size Units cont ...
Страница 6: ...6 Fig 3 Unit Dimensional Drawing 12 Size Unit ...
Страница 7: ...7 Fig 3 Unit Dimensional Drawing 12 Size Unit cont ...
Страница 19: ...19 Fig 25 Typical 50TCQ Control Wiring Diagram Sizes 08 09 ...
Страница 20: ...20 Fig 26 Typical 50TCQ Control Wiring Diagram Size 12 ...
Страница 21: ...21 Fig 27 50TCQ 08 09 Power Wiring Diagram ...
Страница 22: ...22 Fig 28 Typical 50TCQ 12 Power Wiring Diagram 208 230 v 3 Phase 60Hz Unit Shown ...
Страница 45: ......