![Carrier PrimeLINE 69NT40-561 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/carrier/primeline-69nt40-561/primeline-69nt40-561_inspection-manual_2563854021.webp)
17
62-10327
14. Remove left and right hand evaporator access panels. Ensure the
evaporator motor mounting brackets or the evaporator motor stator
brackets are properly torqued. Refer to the
for specific torque values. Locating operation & service
manuals is explained in the
section. Replace panels on
completion assuring all hardware, inclusive of the Mylar washer are
installed. Check that the access panel seals are present and in good
condition and that they seal well when panels are refitted. Use
torque setting: 60 +5 in-lbs.
15. Examine wires and wire harnesses not contained in the control box
for proper location and condition. Replace or repair as necessary.
For Example:
a. Wires to valves
b. Wires to heaters
c. Switch wires
d. Compressor terminal wires
16. All instructional labels and placards should be in place and legible
(Refer to
). The Model/Serial Number plate should also
be in place (Refer to
).
Figure 21 Instruction Labels and Placards
17. Inspect structural integrity of the unit. Check unit for cracks,
damage and missing structural items. Repair as required.
Содержание PrimeLINE 69NT40-561
Страница 2: ......
Страница 4: ......
Страница 8: ...62 10327 4 Figure 3 Evaporator Coil Figure 4 Evaporator Fan Blade...
Страница 11: ...7 62 10327 Figure 9 ETS1 and ETS2 Figure 7 TXV Figure 8 EEV...
Страница 17: ...13 62 10327 Figure 15 Flat Condenser Coil Figure 16 C Condenser Coil Flat condenser coil C condenser coil...
Страница 26: ......
Страница 28: ......
Страница 29: ......