background image

Miniature Low Pressure Transmitter

 

Installation and Operation

 

 

 

 

#NSA-HH/MLP2-001-W-U-A-A-0P-C, NSA-HH/MLP2-002-W-U-A-A-0P-C, NSA-HH/MLP2-003-W-U-A-A-0P-C 
NSA-HH/MLP2-004-W-U-A-A-0P-C, NSA-HH/MLP2-005-W-U-A-A-0P-C, NSA-HH/MLP2-010-W-U-A-A-0P-C 
NSA-HH/MLP2-2D5-W-U-A-A-0P-C, NSA-HH/MLP2-D10-W-U-A-A-0P-C, NSA-HH/MLP2-D25-W-U-A-A-0P-C, NSA-HH/MLP2-D50-W-U-A-A-0P-C 

– 11/14/2019 

 

Specifications subject to change without notice. 

Catalog No. 11-808-764-01 

Page 

3

 of 

4

 

Mounting Instructions 

Using the two #8 x 3/4” self-drilling mounting screws supplied by ACI, mount the unit vertically with the brass fittings 
pointing towards the ground. Attach the unit to the mounting surface using the two mounting openings located on the top 
and bottom flanges. This ensures that any condensation that may form in the tubing does not have an effect on the 
pressure sensor. If mounting the unit horizontally, a slight zero shift may occur and care must be taken to prevent moisture 
from building up in the sensor. For best results, all tubing lengths should be limited to a maximum length of 75 feet (23 
meters). 

 

 

Din Rail Mounting 

 

Figure 2 

 

 

Pressure Connections 

The recommended connection tubing is ¼” O.D. push-on tubing (1/8” – 3/16” I.D.). ACI recommends to keep the tubing 
runs as short as possible so as to not affect the response time. 

 

 

Zero Adjustment 

Small positive or negative pressure offsets can be removed using the Zero push button. Make sure that there is no 
pressure at the HI and LO pressure fittings. Additionally, a small piece of tubing can be connected between the HI and LO 
brass fittings to neutralize any external pressure effects. Press and hold the Zero button for 5 seconds. MLP2 will enter 
zero mode AFTER push button is released. The Zero adjustment should only be performed with no pressure applied. 

 

 

 

Содержание MLP2 Series

Страница 1: ...ss Control Roof Top Units Air Handlers Clean Rooms Isolation Rooms Data Centers Part Numbers NSA HH MLP2 001 W U A A 0P C NSA HH MLP2 002 W U A A 0P C NSA HH MLP2 003 W U A A 0P C NSA HH MLP2 004 W U A A 0P C NSA HH MLP2 005 W U A A 0P C NSA HH MLP2 010 W U A A 0P C NSA HH MLP2 2D5 W U A A 0P C NSA HH MLP2 D10 W U A A 0P C NSA HH MLP2 D25 W U A A 0P C NSA HH MLP2 D50 W U A A 0P C Specifications Su...

Страница 2: ... 4 318 mm I D Push On Flexible Poly Tubing NIST Certification 3 Point NIST Test Points 10 50 90 of FSO 5 Point NIST Test Points 10 30 50 70 and 90 of FSO Product Dimensions L x W x D 4 210 106 94 mm x 2 085 52 96 mm x 1 340 34 04 mm Product Weight 0 17 lbs 0 078 kg Approvals CE RoHS2 WEEE Reach 1 Accuracy includes Hysteresis Linearity and Repeatability at 71ºF 21 5ºC Typical 2 Shift is relative to...

Страница 3: ...e tubing does not have an effect on the pressure sensor If mounting the unit horizontally a slight zero shift may occur and care must be taken to prevent moisture from building up in the sensor For best results all tubing lengths should be limited to a maximum length of 75 feet 23 meters Din Rail Mounting Figure 2 Pressure Connections The recommended connection tubing is O D push on tubing 1 8 3 1...

Страница 4: ... Figure 3 Wiring Instructions Shielded cable with 16 to 22AWG conductors is recommended Use the Wiring Connections table below to determine the proper wiring for your application Insert the wire into the depluggable terminal block sockets and tighten the screws In some circumstances it may be easier to remove the terminal blocks while connecting the wires Wiring Connections Table Output signal Sup...