TESTING
YES/NO
DATE TO BE
COMPLETED
1. The cooling tower fan has been checked for blade pitch and
proper operation.
2. The chilled water and condenser water lines have been:
a. Filled
b. Tested
c. Flushed
d. Vented
e. Strainers cleaned
3. The chilled water and condenser water pumps have been
checked for proper rotation and flow.
4. The following cooling load will be available for start-up:
a. 25%
b. 50%
c. 75%
d. 100%
5. The refrigerant charge is at the machine.
6. Services such as electrical power and control air will be avail-
able at start-up.
7. The electrical and mechanical representatives will be available
to assist in commissioning the machine.
8. The customer’s operators will be available to receive instruc-
tions for proper operation of the chiller after start-up.
Concerns about the installation/request for additional assistance:
I am aware that the start-up time for a Carrier chiller can take between 2 and 6 days depending on the model of the machine and
the options and accessories used with it.
Your contact at the job site will be
Phone number
Beeper number
Fax number
In accordance with our contract, we hereby request the services of your technician to render start-up services per contract terms
for this job on
(Date). I understand that the technician’s time will be charged as extra services due to correcting items
in this checklist that are incomplete.
Signature of Purchaser
Signature of Job Site Supervisor
----------------------------------------------------------------------------------------
CUT
ALONG
DOTTED
LINE
Copyright 1995 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2
Tab
5a
PC 211
Catalog No. 531-965
Printed in U.S.A.
Form 19FA-3SI
Pg CL-2
2-95
Replaces: 19FA-2SI
Содержание HFC-134a
Страница 30: ...Click here for Figure 20 Pumpout Unit Controls Click here for Figure 21 Pumpout Unit Wiring Schematic ...
Страница 40: ...Figure 1 Model Number Identification ...
Страница 41: ...Figure 2 Typical 19FA Installation 1400 2200 Tons 4922 7735 kW ...
Страница 42: ...Figure 3 Machine Rigging Guide 3 Indicates center of gravity ...
Страница 44: ...Figure 5 Machine Footprint ...
Страница 45: ...Figure 6 Machine Contact Surfaces with Anchor Bolts ...
Страница 51: ...Figure 12 Water Piping Oil Cooler to Chilled Water Circuit Typical ...
Страница 52: ...Figure 13 Pumpout Unit ...
Страница 53: ...Figure 14 Typical 19FA Relief Valve Tree for Storage Vessel ...
Страница 54: ...Figure 15 Compressor Terminal Arrangement 18 Lead Rear Inlet ...
Страница 55: ...Figure 16 Compressor Terminal Arrangement 18 Lead Top Inlet ...
Страница 56: ...Figure 17 Compressor Terminal Arrangement 18 Lead Side Inlet ...
Страница 57: ...Figure 18 Oil Pump Wiring ...
Страница 58: ...Figure 19 Oil Heater and Control Power Wiring ...
Страница 59: ...Figure 20 Pumpout Unit Controls ...
Страница 60: ...Figure 21 Pumpout Unit Wiring Schematic ...
Страница 61: ...Figure 22 Carrier Comfort Network Communication Bus Wiring ...
Страница 62: ...Figure 23 COMM1 CCN Communication Wiring For Multiple Chillers Typical ...
Страница 63: ...Figure 24 Typical 19FA With Free Standing Starter ...
Страница 64: ...Figure 25 Field Wiring Low Voltage Motors of PIC Product Integrated Control Free Standing Starter ...
Страница 65: ...Figure 26 19FA Insulation ...