INSTALLATION START-UP REQUEST CHECKLIST
Machine Model Number: 19FA
Serial Number:
To:
Attn:
Date
Project Name
Carrier Job Number
The following information provides the status of the chiller installation.
YES/NO
(N/A)
DATE TO BE
COMPLETED
1. The machine is level.
2. The machine components are installed and connected in
accordance with the installation instructions.
3. The isolation package and grouting (if necessary)
are installed.
4. The relief valves are piped to the atmosphere.
5. All piping is installed and supported. Direction of flow
is indicated in accordance with the installation instructions
and job prints.
a. Chilled water piping
b. Condenser water piping
c. Waterbox drain piping
d. Oil cooler water piping
e. Pumpout unit condenser water piping (if installed)
f. Other
6. Flow switches are installed on both cooler and
condenser water loops.
7. Gages are installed as called for on the job prints required
to establish design flow for the cooler and condenser.
a. Water pressure gages IN and OUT
8. The machine’s starter wiring is complete. The wiring is
installed per installation instructions and certified prints.
a. Power wiring to compressor motor. (Motor leads will
not be taped until the Carrier technician megger tests
the motor.)
b. Oil pump wiring
c. Oil heater/control wiring
d. Flow switch wiring on cooler and condenser
e. Other
9. The motor starter has not been supplied by Carrier. It
has been installed according to the manufacturer’s
instructions.
10. The motor starter has not been supplied by Carrier and it
has been checked for proper operation.
COMMENTS:
CL-1
Содержание HFC-134a
Страница 30: ...Click here for Figure 20 Pumpout Unit Controls Click here for Figure 21 Pumpout Unit Wiring Schematic ...
Страница 40: ...Figure 1 Model Number Identification ...
Страница 41: ...Figure 2 Typical 19FA Installation 1400 2200 Tons 4922 7735 kW ...
Страница 42: ...Figure 3 Machine Rigging Guide 3 Indicates center of gravity ...
Страница 44: ...Figure 5 Machine Footprint ...
Страница 45: ...Figure 6 Machine Contact Surfaces with Anchor Bolts ...
Страница 51: ...Figure 12 Water Piping Oil Cooler to Chilled Water Circuit Typical ...
Страница 52: ...Figure 13 Pumpout Unit ...
Страница 53: ...Figure 14 Typical 19FA Relief Valve Tree for Storage Vessel ...
Страница 54: ...Figure 15 Compressor Terminal Arrangement 18 Lead Rear Inlet ...
Страница 55: ...Figure 16 Compressor Terminal Arrangement 18 Lead Top Inlet ...
Страница 56: ...Figure 17 Compressor Terminal Arrangement 18 Lead Side Inlet ...
Страница 57: ...Figure 18 Oil Pump Wiring ...
Страница 58: ...Figure 19 Oil Heater and Control Power Wiring ...
Страница 59: ...Figure 20 Pumpout Unit Controls ...
Страница 60: ...Figure 21 Pumpout Unit Wiring Schematic ...
Страница 61: ...Figure 22 Carrier Comfort Network Communication Bus Wiring ...
Страница 62: ...Figure 23 COMM1 CCN Communication Wiring For Multiple Chillers Typical ...
Страница 63: ...Figure 24 Typical 19FA With Free Standing Starter ...
Страница 64: ...Figure 25 Field Wiring Low Voltage Motors of PIC Product Integrated Control Free Standing Starter ...
Страница 65: ...Figure 26 19FA Insulation ...