4. Lay fan coil unit on its right side and reinstall coil assembly with condensate pan down. (See Fig. 4.)

5. Attach coil to casing flange using coil mounting screw previously removed.

6. Make sure the pan cap in the fitting door is properly seated on the fitting door to retain the low air leak rating of the unit.

7. Add gaskets from kit KFAHD per kit instructions.

8. Align holes with tubing connections and condensate pan connections, and reinstall access panels and fitting panel.

Make sure liquid and suction tube grommets are in place to prevent air leaks and cabinet sweating. Install after brazing.

HORIZONTAL RIGHT CONVERSION OF UNITS WITH A-COILS

1. Remove blower and coil access panels. (See Fig. 5.)

2. Remove metal clip securing fitting panel to condensate pan. Remove fitting panel.

3. Remove 2 snap-in clips securing A-coil in unit.

4. Slide coil and pan assembly out of unit.

5. Remove horizontal drain pan support bracket from coil support rail on left side of unit and reinstall on coil support rail on right side of unit.

6. Convert air-seal assembly for horizontal right.

a. Remove air-seal assembly from coil by removing 4 screws. (See Fig. 5.)

b. Remove air splitter (B) from coil seal assembly by removing 3 screws. (See Fig. 5—factory shipped inset.)

c. Remove filter plate (A) and install air splitter (B) in place of filter plate.

d. Install filter plate (A) as shown in horizontal right application.

e. Remove condensate troughs (C) and install on opposite tube sheets.

f. Install hose onto plastic spout.

7. Install horizontal pan on right side of coil assembly.

8. Slide coil assembly into casing. Be sure coil bracket on each corner of vertical pan engages coil support rails.

9. Reinstall 2 snap-in clips to correctly position and secure coil assembly in unit. Be sure clip with large offsets is used on right side of unit

to secure horizontal pan.

Fig. 2—Slope Coil Unit in Horizontal Left Application

A00070

UNIT

FIELD
SUPPLIED
HANGING
STRAPS

LOW VOLT
ENTRY
OPTIONS

POWER
ENTRY OPTIONS

SECONDARY
DRAIN

018-060 21-IN.
070 24-IN.
FRONT SERVICE
CLEARANCE
(FULL FACE
OF UNIT)

SECONDARY
DRAIN

A-COIL
HORIZONTAL LEFT

PRIMARY
DRAIN

PRIMARY
DRAIN

1 3/4 IN.
FILTER ACCESS
CLEARANCE

—3—

Содержание FA4B

Страница 1: ...se of this the units need special attention in the condensate pan and drain connection area and when brazing tubing These units are available for systems of 18 000 through 60 000 Btuh nominal cooling...

Страница 2: ...ith access panels facing up or down The FH4B003 and 004 size units equipped with accessory cooling coils are not approved for horizontal applications All other units are factory built for horizontal l...

Страница 3: ...l on coil support rail on right side of unit 6 Convert air seal assembly for horizontal right a Remove air seal assembly from coil by removing 4 screws See Fig 5 b Remove air splitter B from coil seal...

Страница 4: ...om Step 10 in the right side of the coil door making sure that the cap snaps and seats cleanly on the back side of the coil door Make sure no insulation interferes with seating of the cap Fig 3 Remova...

Страница 5: ...vapor barrier Units equipped with 20 30kw electric heaters require a 1 in clearance to combustible materials for the first 36 in of supply duct Ductwork Acoustical Treatment Metal duct systems that d...

Страница 6: ...h located within sight from and readily accessible from the unit Fig 6 A Coil in Horizontal Left Application Factory Ready A00072 A B C FACTORY SHIPPED HORIZONTAL LEFT APPLICATION AIR SEAL ASSEMBLY HO...

Страница 7: ...voltage connections between the thermostat the unit and the outdoor equipment If the thermostat is located more than 100 ft from the unit as measured along the low voltage wire use No 16 AWG color co...

Страница 8: ...d in control box E Minimum CFM and Motor Speed Selection Units with or without electric heaters require a minimum CFM Refer to the unit wiring label to ensure that the fan speed selected is not lower...

Страница 9: ...nection first 1 Cut tubing to correct length 2 Insert tube into sweat connection on unit until it bottoms 3 Braze connection using silver bearing or non silver bearing brazing materials Do not use sol...

Страница 10: ...x nut then tighten with wrench 1 2 turn Do not exceed 30 ft lbs PROCEDURE 7 CONDENSATE DRAINS To connect drains the cap openings must be removed Use a knife to start the opening near the tab and using...

Страница 11: ...ee Fig 1 2 4 5 and 6 To prevent property damage and achieve optimum drainage performance BOTH primary and secondary drain lines should be installed and include properly sized condensate traps See Fig...

Страница 12: ...l as possible See Fig 20 Make sure that the outlet of each trap is below its connection to the condensate pan to prevent condensate from overflowing the drain pan Prime all traps test for leaks and in...

Страница 13: ...or W energizes electric heat relay s which completes circuit to heater element s When W is de energized electric heat relay s open turning off heater elements When G is de energized there is a 90 sec...

Страница 14: ...d minimize possible equipment failure it is essential that periodic maintenance be performed on this equipment Consult your local dealer as to the proper frequency of maintenance contract Fig 21 Wirin...

Страница 15: ...required if filter replacement or cleaning on a monthly basis Fig 23 Wiring Layout of Humidifier to Fan Coil with Electric Heat A95295 R G W Y THERMOSTAT R G W2 W3 E C FAN COIL CONTROL C Y AIR COND HU...

Страница 16: ...2003 CAC BDP 7310 W Morris St Indianapolis IN 46231 imfa4b02 16 Book Tab 1 4 3d 2e Catalog No 63FA 4B1...

Отзывы: