B.

Downflow Installation

CAUTION: The conversion of the fan coil to downflow requires special procedures for the condensate drains on both

A-coil and Slope units. The vertical drains have an overflow hole between the primary and secondary drain holes. This hole
is plugged for all applications except downflow, but must be used for downflow. During the conversion process, remove the
plastic cap covering the vertical drains only and discard. Remove the plug from the overflow hole and discard. At completion
of the downflow installation, caulk around the vertical pan fitting to door joint to retain the low air leak performance of the
unit. Failure to follow this CAUTION could result in minor personal injury or product and property damage.

In this application, field conversion of the evaporator is required using accessory downflow kit along with an accessory base kit. Use fireproof
resilient gasket, 1/8- to 1/4-in. thick, between duct, unit, and floor.

NOTE:

To convert units for downflow applications, refer to Installation Instructions supplied with kit for proper installation. For slope fan coils,

use kit Part No. KFADC0201SLP. For A-coils, use kit Part No. KFADC0401ACL. Use fireproof resilient gasket, 1/8- to 1/4-in. thick, between
duct, unit, and floor.

NOTE:

Gasket kit number KFAHD0101SLP is also required for all downflow applications to maintain low air leak/low sweat performance.

C.

Horizontal Installation

Units must not be installed with access panels facing up or down. The FH4B003 and 004 size units equipped with accessory cooling coils are not
approved for horizontal applications. All other units are factory built for horizontal left installation. (See Fig. 2 and 6.) When suspending unit from
ceiling, dimples in casing indicate suitable location of screws for mounting metal support straps. (See Fig. 2.)

CAUTION: For optimum condensate drainage performance in horizontal installations, unit should be leveled along its

length and width. Failure to follow this CAUTION could result in minor personal injury or product and property damage.

NOTE:

Modular units can be disassembled and components moved separately to installation area for reassembly. This process accommodates

small scuttle holes and limiting entrances to installation sites. (See Fig. 3.)

HORIZONTAL RIGHT CONVERSION OF UNITS WITH SLOPE COILS

NOTE:

Gasket kit number KFAHD0101SLP is required for horizontal slope coil conversion to maintain low air leak/low sweat performance.

1. Remove blower and coil access panel and fitting panel. (See Fig. 4.)

2. Remove coil mounting screw securing coil assembly to right side casing flange.

3. Remove coil assembly.

Fig. 1—Slope Coil Unit in Upflow Application

A00069

A COIL

UNITS

POWER ENTRY

OPTIONS

LOW VOLT
ENTRY
OPTIONS

FIELD MODIFIED
SIDE RETURN
LOCATION FOR
SLOPE COIL
UNITS ONLY

FIELD SUPPLIED
RETURN PLENUM

UPFLOW/DOWNFLOW

SECONDARY DRAIN

UPFLOW/DOWNFLOW

PRIMARY DRAIN

UNIT

018/024

030/036

A

12 In.

17 In.

A

1

2

1

2

19

FIELD SUPPLIED
SUPPLY DUCT

21-IN. FRONT SERVICE

CLEARANCE

UPFLOW/DOWNFLOW

SECONDARY DRAIN

UPFLOW/DOWNFLOW

PRIMARY DRAIN

018-060
       070 24-IN.

042

19 In.

—2—

Содержание FA4B

Страница 1: ...se of this the units need special attention in the condensate pan and drain connection area and when brazing tubing These units are available for systems of 18 000 through 60 000 Btuh nominal cooling...

Страница 2: ...ith access panels facing up or down The FH4B003 and 004 size units equipped with accessory cooling coils are not approved for horizontal applications All other units are factory built for horizontal l...

Страница 3: ...l on coil support rail on right side of unit 6 Convert air seal assembly for horizontal right a Remove air seal assembly from coil by removing 4 screws See Fig 5 b Remove air splitter B from coil seal...

Страница 4: ...om Step 10 in the right side of the coil door making sure that the cap snaps and seats cleanly on the back side of the coil door Make sure no insulation interferes with seating of the cap Fig 3 Remova...

Страница 5: ...vapor barrier Units equipped with 20 30kw electric heaters require a 1 in clearance to combustible materials for the first 36 in of supply duct Ductwork Acoustical Treatment Metal duct systems that d...

Страница 6: ...h located within sight from and readily accessible from the unit Fig 6 A Coil in Horizontal Left Application Factory Ready A00072 A B C FACTORY SHIPPED HORIZONTAL LEFT APPLICATION AIR SEAL ASSEMBLY HO...

Страница 7: ...voltage connections between the thermostat the unit and the outdoor equipment If the thermostat is located more than 100 ft from the unit as measured along the low voltage wire use No 16 AWG color co...

Страница 8: ...d in control box E Minimum CFM and Motor Speed Selection Units with or without electric heaters require a minimum CFM Refer to the unit wiring label to ensure that the fan speed selected is not lower...

Страница 9: ...nection first 1 Cut tubing to correct length 2 Insert tube into sweat connection on unit until it bottoms 3 Braze connection using silver bearing or non silver bearing brazing materials Do not use sol...

Страница 10: ...x nut then tighten with wrench 1 2 turn Do not exceed 30 ft lbs PROCEDURE 7 CONDENSATE DRAINS To connect drains the cap openings must be removed Use a knife to start the opening near the tab and using...

Страница 11: ...ee Fig 1 2 4 5 and 6 To prevent property damage and achieve optimum drainage performance BOTH primary and secondary drain lines should be installed and include properly sized condensate traps See Fig...

Страница 12: ...l as possible See Fig 20 Make sure that the outlet of each trap is below its connection to the condensate pan to prevent condensate from overflowing the drain pan Prime all traps test for leaks and in...

Страница 13: ...or W energizes electric heat relay s which completes circuit to heater element s When W is de energized electric heat relay s open turning off heater elements When G is de energized there is a 90 sec...

Страница 14: ...d minimize possible equipment failure it is essential that periodic maintenance be performed on this equipment Consult your local dealer as to the proper frequency of maintenance contract Fig 21 Wirin...

Страница 15: ...required if filter replacement or cleaning on a monthly basis Fig 23 Wiring Layout of Humidifier to Fan Coil with Electric Heat A95295 R G W Y THERMOSTAT R G W2 W3 E C FAN COIL CONTROL C Y AIR COND HU...

Страница 16: ...2003 CAC BDP 7310 W Morris St Indianapolis IN 46231 imfa4b02 16 Book Tab 1 4 3d 2e Catalog No 63FA 4B1...

Отзывы: