![Carrier CT2-29-TV Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/carrier/ct2-29-tv/ct2-29-tv_workshop-manual_2562588073.webp)
6--3
62--11161
6.2 STARTER (CT2--29--TV) (Continued)
6.2.3 Assembly
1. Solenoid Switch Mounting Nut
2. Starter Drive Housing
3. Drive Lever
4. Gasket
5. Solenoid Switch
6. C Terminal Nut
7. Snap Ring
8. Overrunning Clutch
9. Armature
10. Brush Spring
11. Connecting Lead
12. Rear End Frame
13. Gasket
14. Break Spring
15. Break Shoe
16. End Frame Cap
17. Screw
18. Yoke
19. Brush
20. Brush Holder
21. Through Bolt
1. Unscrew the C terminal nut (6), and disconnect the connecting lead (11).
2. Unscrew the solenoid switch mounting nuts (1), and remove the solenoid switch (5).
3. Remove the end frame cap (16).
4. Remove the break shoe (15), break spring (14) and gasket (13).
5. Unscrew the through bolts (21), and remove the rear end frame (12).
6. Unscrew the brush from the brush holder while holding the spring up.
7. Remove the brush holder (20).
8. Draw out the yoke (18) from the starter drive housing (2).
9. Draw out the armature (9) with the drive lever (3).
NOTE
Do not damage the brush and commutator.
When Reassembling
Apply grease (Carrier Part No. 07--00245--00) to the parts indicated in the figure.
-- Joint of solenoid switch (a)
-- Bushing (b)
-- Drive lever (c)
-- Collar (d)
-- Teeth of pinion gear (e)
-- Armature shaft (f)
Tightening
Torque
C Terminal Nut
7.8 to 9.8 N
.
m
0.8 to 1.0 kgf
.
m
5.8 to 7.2 ft--lbs