18
7 .2
Boiler template
BWCAAG000120 - BWCAAG000150 (combi)
(
(
7 1
(
(
(
(
(
(
BWHAAG000120 - BWHAAG000150 (heating only)
80
3 1/8" -
(
mm
)
4 3
1 1 1 / 1 6 " - (
m m )
6 5
(
m m )
2 9 / 1 6 "
6 5
(
m m )
2 9 / 1 6 "
7 1
(
m m )
2 1 3 / 1 6 "
9 7
(
m m )
3 1 3 / 1 6 "
4 2 0
1 6 1 / 2 " - (
m m )
d i m e n s i o n b o i l e r
3 8 7
1 5 1 / 4 " - (
m m )
20
3/4" -
(
mm
)
67
8
26 11/16" -
(
mm
)
74
0
29 1/8" -
(
mm
)
4 7 . 7 5
(
m m )
1 7 / 8 "
7 3 . 7 5
(
m m )
2 7 / 8 "
2 9
(
m m )
1 1 / 8 "
3 6
(
m m )
1 7 / 1 6 "
33
0
8 1/4" -
(
mm
)
Minimum top clearanc
e
4 0 6 . 5
1 6 " - (
m m )
3 8
1 1 / 2 " ( x 2 ) - (
m m )
3 . 4
1 / 8 " - (
m m )
1 6 . 6
5 / 8 " - (
m m )
1 6 . 6
5 / 8 " - (
m m )
80
3 1/8" -
(
mm
)
1 2 0
4 3 / 4 " - (
m m )
3 . 4
1 / 8 " - (
m m )
80
3 3
/16
"
-
(
mm
)
25
1
9 7/8" -
(
mm
)
80
3 3
/16
"
-
(
mm
)
1 00
4 " - (
m m)
21
8
8 9/16" -
(
mm
)
15
0
5 7/8" -
(
mm
)
Minimum bottom clearanc
e
3/4" NPT
3/4" NPT
3/4" NPT
3/4" NPT
Bottom of Casing
Heating supply-Pressure relief valve
3/4" NPT 3/4" NPT
Gas
3/4" NPT
Indirect water tank
return
3/4" NPT
Minimun side clearance
0.984 inch / 1"
Minimun side clearance
0.984 inch / 1"
Top of Casing
CENTER LINE
OF BOILER
L
C
Ensure there is adequate clearances for mounting the boiler
(details given in installation instructions).
The wall mount bracket is designed for a stud spacing of 16 inches from center.
For other stud spacing a solid mounting surface must be provided by the installer.
Do not mount the boiler to a hollow wall.
Be sure to mount the boiler to the studs only.
Mount the wall bracket using 4 5/16" lag screws.
Ensure the bracket is level when mounted.
Extreme care is needed to ensure the bolts are secured in the studs.
This boiler is heavy and awkward to lift. It is
recommended and safer to install the boiler with two
people. Use caution as to not drop this boiler which
could cause personal injury. Verify that the boiler is
securely mounted before leaving the boiler unsupervised.
WARNING
Boiler bracket (supplied)
Ø1/4" holes for 5/16"
lag screws (4 places)
Air inlet
Exhaust flue outlet
Wall stud
3/4" NPT
FEMALE
condensate
check valve
3/4" NPT
Heating return
3/4" NPT
Indirect water tank
supply
3/4" NPT
7 .2 .1
Installation steps
Prior to lifting the boiler onto the wall, use the enclosed template to
level and locate the wall bracket.
- Fasten the boiler support plate to the wall and use a spirit level to
make sure it is perfectly horizontal.
- Mark the placement of the 2 holes for securing the boiler support
plate make sure that all measurements are exact, then drill the wall
using drill tips with the diameters indicated on the wall template.
- Fix the plate, using the wall template, to the wall.
- Hang the boiler.
- Fix the pressure relief valve (PRV) ad described on the wall
template.
- Install the condensate check valve dispositive.
-
Install the hydraulic connections.