Carrier AIRSTREAM 42BHE Скачать руководство пользователя страница 2

2

See drawings for unit configurations, dimensions, clearanc-

es, and pipe connections. Refer to unit wiring label for all elec-

trical connections. Follow NEC (National Electrical Code) and

local codes.

INSTALLATION

Step 1 — Unpack and Inspect Unit — 

Remove ship-

ping wraps from unit and check shipment against shipping list.

Check for concealed shipping damage. If shipment is damaged

or incomplete, file claim with transportation company and

contact your local Carrier representative immediately.

Step 2 — Protect Unit from Damage — 

To main-

tain warranty, protect unit against adverse weather conditions,

theft or vandalism on the jobsite.

The described equipment 

IS NOT

 suitable for outdoor in-

stallations. The equipment should never be stored or installed

where it may be subjected to a hostile environment such as

rain, snow, or extreme temperatures.

Step 3 — Prepare Jobsite — 

To save time and to re-

duce the possibility of costly errors, set up a complete sample

installation in a typical room at jobsite. Check all critical di-

mensions such as pipe, wire and duct connection requirements.

Refer to job drawings and product dimension drawings as re-

quired. Instruct all trades in the appropriate part of the installa-

tion. For unit component identification, refer to Fig. 1.  For unit

dimensions, refer to Fig. 2 for 42BHE units and Fig. 3 for

42BVE units.

NOTES:

1. All dimensions are in inches (±

1

/

4

 in.).

2. Any modifications to product specifications by any person are subject to acceptance of the factory. Product specifications are subject to change without notice.
3. Right hand shown, left hand opposite.
4. Hanger rods, which are field supplied, are shown for reference only.

UNIT

42BHE

DIMENSIONS (in.)

Fan Size

Depth

Width

Height

Supply Duct

Return Duct

Mounting Holes

A

B

C

D

E

F

J

K

06

9 x  4

36

28

19

3

/

4

7

1

/

8

10

1

/

2

14

1

/

2

2

1

/

4

24

16

1

/

2

27

1

/

4

35

1

/

4

08

9 x  6

36

28

19

3

/

4

8

1

/

2

10

1

/

2

13

7

/

8

2

1

/

4

24

16

1

/

2

27

1

/

4

35

1

/

4

10

10 x  4

37

1

/

2

37

21

1

/

2

7

1

/

8

11

9

/

16

15

1

/

4

2

1

/

4

33

18

1

/

4

36

1

/

4

37

12

10 x  7

37

1

/

2

37

21

1

/

2

9

15

/

16

11

9

/

16

13

7

/

8

2

1

/

4

33

18

1

/

4

36

1

/

4

37

16

11 x 10

37

3

/

4

47

21

1

/

2

13

3

/

8

12

3

/

4

16

3

/

4

2

1

/

4

43

18

1

/

4

46

1

/

4

37

20

12 x  9

40

1

/

4

48

24

12

1

/

2

13

3

/

4

17

3

/

4

2

1

/

4

44

20

3

/

4

47

1

/

4

39

1

/

2

30

12 x 12

40

1

/

4

48

32

1

/

4

15

7

/

8

13

3

/

4

16

7

1

/

4

44

29

47

1

/

4

39

1

/

2

40

15 x 12

43

1

/

2

62

32

1

/

4

16

7

/

16

16

1

/

16

22

3

/

4

6

1

/

4

58

29

61

3

/

4

42

1

/

2

Fig. 2 — Unit Dimensions — 42BHE Units

A42-659ef

Содержание AIRSTREAM 42BHE

Страница 1: ...ty or equip ment use good judgment and follow safe practices as outlined below when installing and operating this equipment INTRODUCTION The following contains general installation instructions for th...

Страница 2: ...ements Refer to job drawings and product dimension drawings as re quired Instruct all trades in the appropriate part of the installa tion For unit component identification refer to Fig 1 For unit dime...

Страница 3: ...side or bottom of the filter rack on horizontal unit 42BHE If side access to filter is desired the minimum clearance required is the width of the filter rack plus 6 inches 6 Protect unit from damage f...

Страница 4: ...g and valves not located over drain pans or drip lips must be insulated to prevent damage from sweating Vent all coils during final preparations See Step 10 section 6 Check interior unit piping for si...

Страница 5: ...3 42BHE BVE ELECTRIC HEATER DATA Table 4 MOTOR PERFORMANCE DATA FULL LOAD AMPS NOTES 1 Motor full load amps refer to National Electric Code NEC amps actual motor nameplate amps may vary 2 NEC data ext...

Страница 6: ...ilter access panel Step 10 Make Final Preparations 1 TURN POWER OFF Open unit electrical disconnect 2 Clean unit thoroughly Remove dirt and debris from unit especially drain pan drain line motor and f...

Страница 7: ...perating conditions specified at the time of order entry Proper belt drive alignment and tension must be maintained when adjusting the unit fan drive speed The drive belt tension should not exceed 3 1...

Страница 8: ...ld be in stalled to shut off the water when the fan stops The following two practices will also help avoid condensa tion problems 1 Continuous fan operation with motorized chilled water valve controll...

Страница 9: ......

Страница 10: ...to discontinue or change at any time specifications or designs without notice and without incurring obligations Catalog No 04 53420006 01 Printed in U S A Form 42B 3SI Pg 10 2 11 Replaces 42B 2SI Cop...

Страница 11: ...valve Yes No 13 Open air vent on top of coil to vent air out of system Yes No 14 Open return ball valve Yes No 15 Engage power only long enough to verify proper blower rotation Yes No 16 Check all du...

Страница 12: ...______________________________________ ________________________________________________________________________________________________________ ________________________________________________________...

Отзывы: