CL-2
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
--
- -
-
- -
- -
-
- -
-
- -
-
- -
- - -
CUT ALON
G
DOTT
E
D
LINE
CU
T ALONG DOTTED LINE
START-UP CHECKLIST
NOTE: Prior to performing start-up, the crank case heaters must operate for 24 hours.
A BACview device is required to perform unit start-up.
PROJECT INFORMATION
Job Name ______________________________________
Installing Contractor _________________________________
Address ________________________________________
Carrier Office ______________________________________
City __________________ State ________ Zip ________
Serial Number ______________________________________
Software __________________________________________
Model Number __________________________________
Software Date ______________________________________
CHECKLIST
Verify the unit is free of damage. If damage exists, contact your local Carrier representative.
Check the unit power feed for voltage and phasing.
Check unit power wiring, verify correct fuses/breakers are installed.
Verify all electrical connections and terminals are tight.
Verify the crankcase heater(s) have been operating for 24 hours.
Verify all packing materials have been removed from the unit.
Verify all unit accessories have been installed.
Verify outdoor intake hood and screen has been installed.
Verify control cabinet ventilation holes are free from obstruction.
Verify exhaust/relief hood and screen (if equipped) has been installed.
Verify barometric relief damper (equipped) has been installed and moves freely.
Verify the unit service clearances are in accordance with manufacturers recommendation.
Verify if the supply and exhaust duct pressure transducers (if equipped) have been installed.
Verify leaving air/supply air temperature sensor has been installed.
Check for refrigerant leaks.
Check compressor oil level.
Check condenser fan rotation.
Check condenser coil for debris.
Check gas piping for leaks (for gas heat units, if equipped).
Verify gas furnace condensate drain has been installed as per the unit instructions.
Check hot water piping (if equipped) for leaks.
Verify hot water control valve has been installed and is operational (if equipped with hydronic heat).
Verify the unit filters and ERW filters (if equipped) have been installed and are clean.
Verify ECW belt is installed at the proper tension.
Verify the unit is level within tolerances for proper condensate drainage.
Verify condensate drain is installed as per unit instructions.
Verify all duct fire dampers or VAV dampers are open.
Check fan blower clearance.
Verify the controller power switch is on and the battery is installed.
Verify control time and data has been set, and schedules are active.
Verify control set points are accurate.
NOTE: Cooling start-up is only recommended when ambient air temperatures are above 55 F.