background image

11

Vertical package air conditionners

WICHTIG: WIEDERBEHEIZUNG DER

OLWANNE

IMPORTANT: CRANKCASE HEATING

IMPORTANT: SURCHAUFFE CARTER D’HUILE

IMPORTANTE: RISCALDARE IL CARTER

DELL’OLIO

IMPORTANTE: RECALENTAMIENTO DE

ACEITE DEL CÁRTER

KOENNEN.

TO ALLOW THE COMPRESSOR(S) STARTING

AU PREMIER DÉMARRAGE OU APRÈS UNE ABSCENCE

T E N S I O N   2 4   H E U R E S   A V A N T   D ’ A U T O R I S E R   L E
DÉMARRAGE DU(DES) COMPRESSEUR(S).

AL PRIMO AVVIAMENTO U DOPO UNA INTERRUZIONE
PROLUNGATA DELLA ALIMENTAZIONE ELETTRICA,
LASCIARE LA MACCINA SOTTO TENSIONE PER 24 ORE
PRIMA DI AUTORIZZARE L’AVVIAMENTO DEL(DEI)
COMPRESSORE(I).

ANTES DEL PRIMER ARRANQUE O DESPUÉS DE UNA
AUSENCIA DE CORRIENTE POR UN LARGO PERIODO DE
TIEMPO, CONVIENE QUE LA UNIDAD ESTÉ CONECTADA
UN MÍNIMO DE 24 HORAS.

BEIDER ERSTEN INBETRIEBSETRUNZ ORDER NACH EINER
LANGEN STROMUNTER-BRECHUNG BRINGEN SIE DIE
M A S C H I N E   U N T E R   S P A N N U N G   2 4   S T R U N D E R L A N G
BEVOR SIE DEN(DIE) KOMPRESSOR(EN) EINSCHALTEN

FOR THE FIRSTSTART OR AFTER ALONG TIME OUT OF
VOLTAGE PUT THE MACHINE ON LIVE 24 HOURS BEFORE

DE COURANT PROLONGÉE, METTRE LA MACHINE SOUS

-   All models of 50NZ/NF Series are equipped with Scroll compressors 

and include a phase control relays. 

Check that they rotate in the correct 

sense, and if it does not occur, reverse 

two wires of the power supply.

-  When starting the compressor, check 

the undercooling and overheating and thus verify if the refrigerant 

charge is appropriate to the operating 

conditions. To adjust the refrigerant charge, a 

schrader valve is available on the liquid line.

-  Verify the absence of any leaks of the 

refrigerant.

-  Check the unit operation and verify the safety elements.

COMPRESOR SCROLL.

COMPROBAR SENTIDO DE GIRO

COMPRESSEUR SCROLL.

VÉRIFIER LE SENS DE ROTATION

SCROLL COMPRESSOR.

CHECK SENSE OF ROTATION

11. C

OMMISSIONING

Operational checks

Check the unit operation by verifying the electronic control and the 

safety elements.

It is also recommendable to create a report, taking note of the date, 

which includes the following information: the nominal voltage, current 

absorbed by the compressors, fans and other electrical components, 

signifi cant temperatures in the cooling circuit (see table below) and 

other aspects considered interesting such as alarms detected by the 

electronic control of the unit. The recording of these parameters whilst 

the unit is running allows controlling the installation performance and 

it is the best possible way to avoid breakdowns since the analysis 

of these data makes early detection of anomalies possible or the 

provision of the necessary means available to ensure that they do 

not take place.

Possible problems at commissioning

All indications given in this brochure must be respected and 

complied with to guarantee a correct operation of the units.

Next, several possible operation problems are stated which could 

happen if the conditions of the commissioning are not appropriate.

- Air 

fl ow lack: very high differences between inlet and outlet, originated 

by a high pressure drop in the ducts, or by other causes that impede 

the correct air circulation.

-  Air recirculation in the unit, originated by some obstacle in the air 

aspiration or outlet.

-  Noise problems because of excessive air fl ow in the grille.

- Water overfl owing to the pan problems, originated by an excessive 

fl ow, an incorrect siphon installation or because a defective unit level.

-  Refrigerant circuit humidity problem, because of an incorrect vacuum 

realization.

Checks prior to commissioning

-  It is advisable to make a complete sketch of the installation including 

the location of the unit and all the components used. This will be very 

helpful for maintenance and repairs to the installation.

-  Check that the electrical power supply matches the unit voltage and 

that its value lies within acceptable limits.

-  It must also be verifi ed that the electric installation has been carried 

out according to the electric wiring diagram provided with the unit 

(consult the chapter on “Checking before commissioning”).

-  Once the above verifi cations have been carried out, the control 

circuit is supplied with voltage by the automatic control switch. It is 

necessary to leave with voltage the compressor crankcase heater 

for 24 hours before starting the compressor.

Cooling MODE

Heating MODE

Compressor

Aspiration pressure

bar

Compressor

Aspiration pressure

bar

Aspiration temp. (1)

ºC

Aspiration temp. (1)

ºC

Condens. pressure

bar

Condens. pressure

bar

Condens. temp. (2)

ºC

Condens. temp. (2)

ºC

Air 
condenser

Gas inlet temperature ºC

Air 
evaporator

Liquid inlet temp.

ºC

Liquid outlet temp. (3) ºC

Gas outlet temp. (4)

ºC

Air inlet temperature

ºC

Air inlet temperature

ºC

Outdoor temperature

ºC

Outdoor temperature

ºC

Air outlet temperature ºC

Air outlet temperature ºC

Air 
evaporator

Air inlet temperature

ºC

Air 
condenser

Air inlet temperature

ºC

Air outlet temperature ºC

Air outlet temperature ºC

Liquid inlet temp.

ºC

Gas inlet temperature ºC

Evap. outlet temp. (4) ºC

Liquid outlet temp. (3) ºC

Undercooling (2) - (3)

ºC

Undercooling (2) - (3)

ºC

Overheating (4) - (1)

ºC

Overheating (4) - (1)

ºC

Содержание 50NF

Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS 50NZ NF Nominal cooling capacity 17 9 69 6 kW Nominal heating capacity 18 4 73 0 kW 50 Hz Vertical package air conditionners Original document...

Страница 2: ...ns 8 Checks at fans 8 Condensate drain connection 8 9 Safety elements 9 High pressure pressostat 9 Low pressure pressostat 9 Magnetothermals for line protection 9 Automatic switch in the control circu...

Страница 3: ...e of its vertical construction 50NZ Series Air air packaged cooling units 50NF Series Air air packaged reversible heat pumps After their manufacture all units are charged with refrigerant and are test...

Страница 4: ...14 7 13 14 Type Centrifugal Number 1 2 Motor output kW 1 1 1 5 2 2 3 0 1 5 2 2 3 0 Speed r p m 630 680 699 644 680 699 644 Indoor circuit fan Nominal air flow m3 h 4 000 4 600 6 000 7 000 9 200 12 00...

Страница 5: ...location 5 TRANSPORT The unit must be lifted and fixed with care and without inclination maximum inclination 15 since it could harm its operation The unit can be handled with a forklift truck taking a...

Страница 6: ...d and walls in order that the circuit makes the aspiration of the return air 7 LOCATION AND ASSEMBLING Anchorage for antivibrators A B Minimum free space for commissioning and maintenance operations E...

Страница 7: ...th the control in the unit The electrical heaters requested for units already shipped will be sent in a kit and the installer will need to assemble the necessary elements for the operation of the unit...

Страница 8: ...tection mesh in the discharge as per the current regulation Air ducts connections Before commissioning check the blade rotation direction and that the axis turns without strokes nor vibrations Once ru...

Страница 9: ...l circuit Magnetothermal switch that protects the operation circuit against continuous surges as well as against high currents of short duration short circuits Fans and compressors protection Both the...

Страница 10: ...must be emptied Possible water freezing must be avoided glycolling water or by using anti frost thermostat that triggers the circulation pump In models 120 and 160 the hot water coil assembly is carr...

Страница 11: ...e way to avoid breakdowns since the analysis of these data makes early detection of anomalies possible or the provision of the necessary means available to ensure that they do not take place Possible...

Страница 12: ...l and taken from a can tightly closed until the moment of the charge Note Both the oil type as well as the volume needed for each model are stated in the Technical characteristic tables in chapter 3 R...

Страница 13: ...charge fan of the internal circuit Access to the indoor of the frame through this lateral panel Condensates drain pans Access Firstly put the door switch in O position Later unscrew the screws that fi...

Страница 14: ...element are open c Timing of anti cycle short does not allow the starting d Open contact e Contactor coil burnt f Indoor klixon open a Check differential fuses b Verify the safety chain of the electr...

Страница 15: ......

Страница 16: ...Order No 10055 03 2015 Supersedes order No New Manufactured for CARRIER in Spain The manufacturer reserves the right to change the specification without prior notice Printed in the European Union...

Отзывы: