11
Vertical package air conditionners
WICHTIG: WIEDERBEHEIZUNG DER
OLWANNE
IMPORTANT: CRANKCASE HEATING
IMPORTANT: SURCHAUFFE CARTER D’HUILE
IMPORTANTE: RISCALDARE IL CARTER
DELL’OLIO
IMPORTANTE: RECALENTAMIENTO DE
ACEITE DEL CÁRTER
KOENNEN.
TO ALLOW THE COMPRESSOR(S) STARTING
AU PREMIER DÉMARRAGE OU APRÈS UNE ABSCENCE
T E N S I O N 2 4 H E U R E S A V A N T D ’ A U T O R I S E R L E
DÉMARRAGE DU(DES) COMPRESSEUR(S).
AL PRIMO AVVIAMENTO U DOPO UNA INTERRUZIONE
PROLUNGATA DELLA ALIMENTAZIONE ELETTRICA,
LASCIARE LA MACCINA SOTTO TENSIONE PER 24 ORE
PRIMA DI AUTORIZZARE L’AVVIAMENTO DEL(DEI)
COMPRESSORE(I).
ANTES DEL PRIMER ARRANQUE O DESPUÉS DE UNA
AUSENCIA DE CORRIENTE POR UN LARGO PERIODO DE
TIEMPO, CONVIENE QUE LA UNIDAD ESTÉ CONECTADA
UN MÍNIMO DE 24 HORAS.
BEIDER ERSTEN INBETRIEBSETRUNZ ORDER NACH EINER
LANGEN STROMUNTER-BRECHUNG BRINGEN SIE DIE
M A S C H I N E U N T E R S P A N N U N G 2 4 S T R U N D E R L A N G
BEVOR SIE DEN(DIE) KOMPRESSOR(EN) EINSCHALTEN
FOR THE FIRSTSTART OR AFTER ALONG TIME OUT OF
VOLTAGE PUT THE MACHINE ON LIVE 24 HOURS BEFORE
DE COURANT PROLONGÉE, METTRE LA MACHINE SOUS
- All models of 50NZ/NF Series are equipped with Scroll compressors
and include a phase control relays.
Check that they rotate in the correct
sense, and if it does not occur, reverse
two wires of the power supply.
- When starting the compressor, check
the undercooling and overheating and thus verify if the refrigerant
charge is appropriate to the operating
conditions. To adjust the refrigerant charge, a
schrader valve is available on the liquid line.
- Verify the absence of any leaks of the
refrigerant.
- Check the unit operation and verify the safety elements.
COMPRESOR SCROLL.
COMPROBAR SENTIDO DE GIRO
COMPRESSEUR SCROLL.
VÉRIFIER LE SENS DE ROTATION
SCROLL COMPRESSOR.
CHECK SENSE OF ROTATION
11. C
OMMISSIONING
Operational checks
Check the unit operation by verifying the electronic control and the
safety elements.
It is also recommendable to create a report, taking note of the date,
which includes the following information: the nominal voltage, current
absorbed by the compressors, fans and other electrical components,
signifi cant temperatures in the cooling circuit (see table below) and
other aspects considered interesting such as alarms detected by the
electronic control of the unit. The recording of these parameters whilst
the unit is running allows controlling the installation performance and
it is the best possible way to avoid breakdowns since the analysis
of these data makes early detection of anomalies possible or the
provision of the necessary means available to ensure that they do
not take place.
Possible problems at commissioning
All indications given in this brochure must be respected and
complied with to guarantee a correct operation of the units.
Next, several possible operation problems are stated which could
happen if the conditions of the commissioning are not appropriate.
- Air
fl ow lack: very high differences between inlet and outlet, originated
by a high pressure drop in the ducts, or by other causes that impede
the correct air circulation.
- Air recirculation in the unit, originated by some obstacle in the air
aspiration or outlet.
- Noise problems because of excessive air fl ow in the grille.
- Water overfl owing to the pan problems, originated by an excessive
fl ow, an incorrect siphon installation or because a defective unit level.
- Refrigerant circuit humidity problem, because of an incorrect vacuum
realization.
Checks prior to commissioning
- It is advisable to make a complete sketch of the installation including
the location of the unit and all the components used. This will be very
helpful for maintenance and repairs to the installation.
- Check that the electrical power supply matches the unit voltage and
that its value lies within acceptable limits.
- It must also be verifi ed that the electric installation has been carried
out according to the electric wiring diagram provided with the unit
(consult the chapter on “Checking before commissioning”).
- Once the above verifi cations have been carried out, the control
circuit is supplied with voltage by the automatic control switch. It is
necessary to leave with voltage the compressor crankcase heater
for 24 hours before starting the compressor.
Cooling MODE
Heating MODE
Compressor
Aspiration pressure
bar
Compressor
Aspiration pressure
bar
Aspiration temp. (1)
ºC
Aspiration temp. (1)
ºC
Condens. pressure
bar
Condens. pressure
bar
Condens. temp. (2)
ºC
Condens. temp. (2)
ºC
Air
condenser
Gas inlet temperature ºC
Air
evaporator
Liquid inlet temp.
ºC
Liquid outlet temp. (3) ºC
Gas outlet temp. (4)
ºC
Air inlet temperature
ºC
Air inlet temperature
ºC
Outdoor temperature
ºC
Outdoor temperature
ºC
Air outlet temperature ºC
Air outlet temperature ºC
Air
evaporator
Air inlet temperature
ºC
Air
condenser
Air inlet temperature
ºC
Air outlet temperature ºC
Air outlet temperature ºC
Liquid inlet temp.
ºC
Gas inlet temperature ºC
Evap. outlet temp. (4) ºC
Liquid outlet temp. (3) ºC
Undercooling (2) - (3)
ºC
Undercooling (2) - (3)
ºC
Overheating (4) - (1)
ºC
Overheating (4) - (1)
ºC
Содержание 50NF
Страница 15: ......