START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO.:
DATE:
SERIAL NO.:
TECHNICIAN:
II. PRE-START-UP (insert checkmark in box as each item is completed)
M
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
M
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
M
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
M
CHECK THAT INDOOR-AIR FILTER IS CLEAN AND IN PLACE
M
VERIFY THAT UNIT INSTALLATION IS LEVEL
M
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
L1-L2
L2,L3
L3-L1
COMPRESSOR AMPS
L1
L2
L3
INDOOR-FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
DB (DRY BULB)
RETURN-AIR TEMPERATURE
DB
WB (WET BULB)
COOLING SUPPLY AIR
ELECTRIC HEATER SUPPLY AIR
PRESSURES (COOLING)
REFRIGERANT SUCTION
PSIG
REFRIGERANT DISCHARGE
PSIG
M
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 19-21.
M
VERIFY 3-PHASE SCROLL COMPRESSOR (048,060 ONLY) IS ROTATING IN CORRECT DIRECTION.
----------------------------------------------------------------------------------------
CUT
ALONG
DOTTED
LINE
CUT
ALONG
DOTTED
LINE
Copyright 1997 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1
4
Tab
5a 5a
PC 111
Catalog No. 565-041
Printed in U.S.A.
Form 50HS-9SI
CL-1
2-97
Replaces: 50HS-8SI