12
Fig. 7 — Rigging Details
Step 7 — Convert to Horizontal and Connect
Ductwork (when required)
Unit is shipped in the vertical duct configuration. Unit without
factory-installed economizer or return-air smoke detector op-
tion may be field-converted to horizontal ducted configuration.
To convert to horizontal configuration, remove screws from
side duct opening covers (see Fig. 8) and remove covers. Use
the screws to install the covers on vertical duct openings with
the insulation-side down. The panels must be inserted into the
notches on the basepan to properly seal. The notches are cov-
ered by the tape used to secure the insulation to the basepan
and are not easily seen. See Fig. 9 for position of the notches in
the basepan. Seals around duct openings must be tight. Secure
with screws as shown in Fig. 10. Cover seams with foil duct
tape.
Field-supplied flanges should be attached to horizontal duct
openings and all ductwork should be secured to the flanges. In-
sulate and weatherproof all external ductwork, joints, and roof
or building openings with counter flashing and mastic in accor-
dance with applicable codes.
Do not cover or obscure visibility to the unit’s informative data
plate when insulating horizontal ductwork.
Fig. 8 — Horizontal Conversion Panels
Fig. 9 — Location of Notches
DETAIL "A"
PLACE ALL SEAL STRIP IN PLACE
BEFORE PLACING UNIT ON ROOF CURB.
DUCT END
SEE DETAIL "A"
"A"
(914-1371)
36"- 54"
"C"
"B"
SPREADER
BARS
REQUIRED
NOTES:
1. SPREADER BARS REQUIRED — Top damage will occur if spreader bars are not used.
2. Dimensions in ( ) are in millimeters.
3. Hook rigging shackles through holes in base rail, as shown in detail “A.” Holes in base rails are centered around the unit center of
gravity. Use wooden top to prevent rigging straps from damaging unit.
UNIT
MAX WEIGHT
DIMENSIONS
A
B
C
lb
kg
in.
mm
in.
mm
in.
mm
50HCQA,D07
1100
500
88.0
2235
40.8
1035
41.5
1055
50HCQD08
1315
598
88.0
2235
41.6
1057
49.5
1257
50HCQD09
1505
684
88.0
2235
40.0
1015
49.5
1257
REMOVABLE HORIZONTAL
SUPPLY DUCT OPENING COVER
REMOVABLE HORIZONTAL
RETURN DUCT OPENING COVER
BASEPAN
NOTCHES
NOTCHES
Содержание 50HCQD07
Страница 4: ...4 Fig 2 Unit Dimensional Drawing 07 08 Size Units ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing 07 08 Size Units cont ...
Страница 6: ...6 Fig 3 Unit Dimensional Drawing 09 Size Units ...
Страница 7: ...7 Fig 3 Unit Dimensional Drawing 09 Size Units cont ...
Страница 24: ...24 Fig 37 Electro Mechanical Control Wiring 50HCQ A07 D07 208 230v 460v 575v ...
Страница 25: ...25 Fig 38 Electro Mechanical Control Wiring 50HCQ D07 Tier 2 1 Compressor 208 230v 460v 575v ...
Страница 26: ...26 Fig 39 Electro Mechanical Control Wiring 50HCQ 08 09 208 230v 460v 575v ...
Страница 27: ...27 Fig 40 Electro Mechanical Power Wiring 50HCQ A07 D07 208 230v 460v 575v ...
Страница 28: ...28 Fig 41 Electro Mechanical Power Wiring 50HCQ D07 Tier 2 1 Compressor 208 230v 460v 575v ...
Страница 29: ...29 Fig 42 Electro Mechanical Power Wiring 50HCQ 08 09 208 230v 460v 575v ...
Страница 30: ...30 Fig 43 PremierLink Wiring Schematic 50HCQ07 09 208 230v 460v 575v ...
Страница 31: ...31 Fig 44 RTU Open System Control Wiring ...
Страница 46: ...46 Fig 52 Completing Installation of Return Air Smoke Sensor Fig 53 EconoMi er IV Wiring STEP 1 STEP 2 STEP 3 ...
Страница 49: ......