Fig. 30 — Defrost Control Board Location
NOTES:
1. Jumper for 1-3 seconds: Factory Test — The defrost interval timing
is reduced by a factor of 0.1 seconds/minute based on the posi-
tions of DIP switches SW1 and SW2 (i.e. 90 minutes will be
reduced to 9 seconds).
2. Jumper for 5-20 seconds: Forced Defrost — Defrost runs for 30
seconds if DFT2 is open.
Table 3 — 50HCQ Defrost Board I/O and Jumper Configurations
POINT NAME
TYPE OF I/O
CONNECTION PIN NUMBER
UNIT CONNECTION
NOTE
INPUTS
G Fan
DI, 24 vac
P2-3
CTB-G
Y1 Cool 1
DI, 24 vac
P2-5
CTB-Y1
Y2 Cool 2
DI, 24 vac
P2-4
CTB-Y2
W1 Heat 1
DI, 24 vac
P2-7
CTB-W1
W2 Heat 2
DI, 24 vac
P2-6
CTB-W2
R Power
24 vac
P3-1
CONTL BRD-8
C Common
24 vac
P3-2
CONTL BRD-4
DFT 1
DI, 24 vac
DFT-1 to DFT-1
—
DFT 2
DI, 24 vac
DFT-2 to DFT-2
—
OUTPUTS
IFO Fan On
DO, 24 vac
P3-9
REHEAT/HP-2
OF OD Fan On
DO, 24 vac
OF
OFR
RVS1
DO, 24 vac
P3-7 to P3-5
—
Energize in COOL
RVS2
DO, 24 vac
P3-6 to P3-4
—
Energize in COOL
COMP 1
DO, 24 vac
P3-10
FPT1-REHEAT/HP-6
COMP2
DO, 24 vac
P3-8
FPT2-REHEAT/HP-8
HEAT 2
DO, 24 vac
E-HEAT
TB4-1
COM
24 vac
P3-3
TB4-3
CONFIGURATION
Select Jumper
24 vac
P1-1
—
2 Compressor
24 vac
P1-3
—
Use for 50TCQD
SPEED-UP CONFIGURATION
Speed-Up Jumper
—
JMP17
—
Speed-Up Jumper
—
JMP18
—
Table 4 — DIP Switch Positions
1
2
1
2
1
2
1
2
3
1
1
1
1
1
On
0
0
0
0
0
Off
30 minutes
(factory default)
60 minutes
90 minutes
120 minutes
Fan Delay
Содержание 50HCQD07
Страница 4: ...4 Fig 2 Unit Dimensional Drawing 07 08 Size Units ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing 07 08 Size Units cont ...
Страница 6: ...6 Fig 3 Unit Dimensional Drawing 09 Size Units ...
Страница 7: ...7 Fig 3 Unit Dimensional Drawing 09 Size Units cont ...
Страница 24: ...24 Fig 37 Electro Mechanical Control Wiring 50HCQ A07 D07 208 230v 460v 575v ...
Страница 25: ...25 Fig 38 Electro Mechanical Control Wiring 50HCQ D07 Tier 2 1 Compressor 208 230v 460v 575v ...
Страница 26: ...26 Fig 39 Electro Mechanical Control Wiring 50HCQ 08 09 208 230v 460v 575v ...
Страница 27: ...27 Fig 40 Electro Mechanical Power Wiring 50HCQ A07 D07 208 230v 460v 575v ...
Страница 28: ...28 Fig 41 Electro Mechanical Power Wiring 50HCQ D07 Tier 2 1 Compressor 208 230v 460v 575v ...
Страница 29: ...29 Fig 42 Electro Mechanical Power Wiring 50HCQ 08 09 208 230v 460v 575v ...
Страница 30: ...30 Fig 43 PremierLink Wiring Schematic 50HCQ07 09 208 230v 460v 575v ...
Страница 31: ...31 Fig 44 RTU Open System Control Wiring ...
Страница 46: ...46 Fig 52 Completing Installation of Return Air Smoke Sensor Fig 53 EconoMi er IV Wiring STEP 1 STEP 2 STEP 3 ...
Страница 49: ......