RTU--OPEN CONTROL SYSTEM
The RTU Open controller is an integrated component of the
Carrier rooftop unit. Its internal application programming
provides optimum performance and energy efficiency. RTU
Open enables the unit to run in 100% stand--alone control
mode, Carrier’s I--Vu Open network, or a Third Party
Building Automation System (BAS). On--board DIP
switches allow you to select your protocol (and baud rate) of
choice among the four most popular protocols in use today:
BACnet, Modbus, Johnson N2 and LonWorks.
The RTU Open control is factory--mounted in the 48HC
unit’s main control box, to the left of the Light
Commercial Terminal Board (LCTB). See Fig. 47.
Factory wiring is completed through harnesses connected
to the LCTB. Field connections for RTU Open sensors
will be made at the Phoenix connectors on the RTU Open
board. The factory--installed RTU Open control includes
the supply--air temperature (SAT) sensor. The outdoor air
temperature
(OAT)
sensor
is
included
in
the
FIOP/accessory EconoMi$er2 package.
SENSORY/ACCESSORY INSTALLATION
There are a variety of sensors and accessories available
for the RTU-OPEN. Some of these can be factory or field
installed, while others are only field installable. The
RTU-OPEN controller may also require connection to a
building network system or building zoning system. All
field control wiring that connects to the RTU-OPEN must
be routed through the raceway built into the corner post of
the unit or secured to the unit control box with electrical
conduit. The unit raceway provides the UL required
clearance between high and low-voltage wiring. Pass the
control wires through the hole provided in the corner post,
then feed the wires thorough the raceway to the
RTU-OPEN. Connect the wires to the removable Phoenix
connectors and then reconnect the connectors to the board.
See Fig. 47.
IMPORTANT
: Refer to the specific sensor or accessory
instructions for its proper installation and for rooftop unit
installation refer to base unit installation instructions and
the unit’s wiring diagrams.
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal
injury, death and/or equipment damage.
Disconnect and lock--out/tagout electrical power
before wiring the RTU--OPEN controller.
!
WARNING
ADDITIONAL RTU--OPEN INSTALLATION
AND TROUBLESHOOTING
Additional installation, wiring and troubleshooting
information for the RTU--OPEN Controller can be found
in the following manuals:
“Controls, Start--up, Operation
and Troubleshooting Instructions,”
and
“RTU Open
Installation and Start--up Guide.”
48H
C
Содержание 48HC D17 Series
Страница 76: ...76 APPENDIX IV WIRING DIAGRAMS C12615 Fig 76 48HC D17 D28 Control Diagram 208 230 3060 460 575 3 60 48HC...
Страница 77: ...77 APPENDIX IV WIRING DIAGRAMS C12616 Fig 77 48HC D17 D28 Power Diagram 208 230 3 60 48HC...
Страница 78: ...78 APPENDIX IV WIRING DIAGRAMS C12617 Fig 78 48HC D17 D28 Power Diagram 460 3 60 48HC...
Страница 79: ...79 APPENDIX IV WIRING DIAGRAMS C12618 Fig 79 48HC D17 D28 Power Diagram 575 3 60 48HC...
Страница 80: ...80 APPENDIX IV WIRING DIAGRAMS C14061 Fig 80 48HC D17 D28 Control Diagram with Humidi MiZer 48HC...
Страница 81: ...81 APPENDIX IV WIRING DIAGRAMS C12620 Fig 81 48HC D17 D28 Power Diagram 208 230 3 60 with Humidi MiZer 48HC...
Страница 82: ...82 APPENDIX IV WIRING DIAGRAMS C12621 Fig 82 48HC D17 D28 Power Diagram 460 3 60 with Humidi MiZer 48HC...
Страница 83: ...83 APPENDIX IV WIRING DIAGRAMS C12622 Fig 83 48HC D17 D28 Power Diagram 575 3 60 with Humidi MiZer 48HC...
Страница 85: ...85 APPENDIX IV WIRING DIAGRAMS C13766 Fig 85 PremierLinkt System Control Wiring Diagram with Humidi MiZer 48HC...
Страница 86: ...86 APPENDIX IV WIRING DIAGRAMS C13767 Fig 86 RTU OPEN Wiring Diagram 48HC...
Страница 87: ...87 APPENDIX IV WIRING DIAGRAMS C13768 Fig 87 RTU OPEN Wiring Diagram with Humidi MiZer 48HC...