■
Assembling the two blocks
-
Check the flatness and levelness of the mounting surface.
-Fit the gasket on the sealing face between the blocks
(fig. A)
.
-
Using the appropriate handling equipment, place the two sections to be joined as close to each other as possible.
-The blocks are assembled on the same level by connecting the frames or the feet using connection components
(fig. B)
. Secure
outdoor units using a TH 8 x 70 screw, washers and nuts
(fig. C)
. A plate provides a seal between the two casings (fitted with
mastic)
(see fig. D in the outdoor assembly section)
If assembling the sections vertically, the top section must not be mechanically fastened to the bottom section. Its weight will keep it in
place.
IMPORTANT: Before tightening the brackets, seal the sections with a gasket or caulking.
B
Fig. A
Fig. B
Fig. C
C
B
Attachment screw
C
Gasket or mastic
Fastening clamps are supplied for a tighter fit between sections
on size 150 and higher air handling units. They may be placed on
the sides or tops of each section.
-Trace the mounting holes (centre distance: 38 mm) and drill
a diameter 4 hole.
-Attach the clamps with the screws supplied.
-Join and tighten the clamps together with the two 6 x 60 mm
screws, washers and nuts.
Comment: these clamps cannot be used on access panels.
IMPORTANT: Do not use the fastening clamps to compensate
for misaligned sections.
15 x 8 mm
gasket
2 cleats
1 M6x60
0.250
EXT. CONN
3 - INSTALLATION
8
Содержание 39CZ
Страница 2: ...2...