5
1
3
1
2
4
2
3
3
3
4
30HXC080
30HXC090
30HXC100
30HXC110
C
600
4
D
A
E
700
B
500
D mm
2360
E mm
kg
C mm
1850
1000
2447
2462
2504
B mm
950
30HXC080
30HXC090
30HXC100
A mm
2705
3220
1875
1000
2846
2861
2956
2971
950
30HXC120
30HXC130
30HXC140
30HXC155
3535
2360
1900
1000 2650
950
30HXC110
2705
3220
2000
1000
3283
3438
950
30HXC175
30HXC190
3550
3 - DIMENSIONS, CLEARANCES, WEIGHT DISTRIBUTION
3.1 - 30HXC 080-190
NOTE: Refer to the certified dimensional drawings supplied with the unit, when designing an installation.
Evaporator
Condenser
Clearances required for
heat exchanger tube
removal. Clearances D and
E can be either on the left
or on the right hand side.
Water inlet
Water outlet
Power supply
kg: total operating weight
Clearances required
for operation and
maintenance
Содержание 30GX 082-358
Страница 35: ......