![Carrier 09PE Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/carrier/09pe/09pe_installation-operation-and-maintenance-instructions_2562558007.webp)
5.3 - Lifting CLUSTER units
NEVER LIFT BOTH UNITS TOGETHER
Separate the two units by removing the bolts connecting the feet
Remove the upper unit
Remove the second unit
(The plastic shims and bolts will be recycled)
5.4 - Instructions for placing the feet in the operating position
■
The feet are in the "transport" position (A) when the unit is delivered.
■ When the unit is finally installed, the feet must be moved to the "use" position (B).
To do this:
Lift the upper unit using the lifting rings. Keep the unit raised throughout the procedure.
Unscrew the 4 mounting bolts on each foot. The other bolts must never be unscrewed. Pull out the foot to reposition it
one notch lower, in its final position.
Retighten the 4 bolts on each foot, then reposition the unit on the ground.
A
B
2
1
3
For the "Skid container" and/or raised feet option, see the additional instructions enclosed with the unit.
2
1
5 - INSTRUCTIONS FOR LIFTING AND PLACING THE FEET IN THE OPERATING
POSITION AND FOR SHIPPING
7
Содержание 09PE
Страница 27: ......