Inwall Access - stud wall
Installing the Cistern -
237 002
Datum
400mm – 420mm
45mm
- Water Supply Connection
90mm Min.
Cavity Depth
5mm Min.
45mm Max.
Cladding Thickness
Refer to
specifications
of the selected
urinal.
335mm
to
access panel
centre line
Service Access Panel
Centre Line (standard mounting)
1.
Calculate the finished floor height
(allowing for floor gradings and tile
thickness, etc.) and add this to the
known height of the selected urinal’s
inlet. Mark this resulting height on
the stud -
This is your datum
and flush pipe centre line.
2.
Screw cistern to studs via the 2
front, top and bottom holes in each
mounting bracket making sure the
water connection fitting is on the left
hand side of cistern.
3.
Fabricate flush pipe using the
Copper Adaptor provided.
4.
Lubricate ‘O’Ring on cistern tail using
soapy water and slide flush pipe on.
5.
Connect the water supply.
6.
Remove Dust Cover, turn Isolating
Tap ON, fill tank & set water level using
Adjusting Screw on the inlet valve.
7.
Check cistern and all joints for leaks.
8.
Turn Isolating Tap
OFF
. Continue
with Preparation for Fitout on page 15.
Water Supply Connection
OFF
ON
Dust Cover