4.2
Installing the R829 Switch Enclosure
Drilling the holes for the switch enclosure hardware is typically much easier to do while the pole is
in the shop. This should make the final installation in the field go quicker.
Ensure that the location of the switch enclosure will not interfere with the signal heads and
signage when they are later installed (see Figure 2).
Drill and tap two holes for mounting the plate. Drill 5/8” hole for the wire, then de-burr the edges
to avoid damaging the wires during installation.
4.3
Creating a Concrete Base
As shown in Figure 3, a concrete foundation with the necessary mounting hardware has been
poured prior to pole installation. The procedure for doing this is outside the scope of this manual.
4.4
Removing the Solar Panel and Battery Covers
First remove the cover with the solar panels from the top of the head module, and then remove
both covers from the two battery modules (see Figure 4).
4.5
Preparing the Solar Panel Module
Turn the solar module upside down to prepare it for installation. Prop up the end of the R829 that
has the radio antenna (see Figure 5) to ensure that this delicate component is not damaged
during assembly. One of the battery covers can be used as a support.
Figure 2
Figure 3
Figure 5
Radio Antenna
Solar Module
Figure 4
Battery Cover
Содержание R829
Страница 2: ......