In its final ‘production’ form the Lightning is almost a ‘Ready-To-Fly’ model, and we complete
more assembly in the factory for it than for any of our other products.
∗∗
Inlet ducts completely fitted and painted.
∗∗
Vertical fin and stabilisers completed, including the retention systems.
∗∗
All the control horns are jig-installed and all the surfaces are hinged.
∗∗
All control surfaces hinged and trimmed.
∗∗
All servo mounts installed.
∗∗
All the gear doors and hatches are cut and trimmed for you.
∗∗
Canopy frame and fixing system all completed for you.
∗∗
Pre-moulded gear doors, trimmed ready to fit.
∗∗
Wings trimmed, pre-aligned and incidences set.
∗∗
Engine bypass ducting pre-installed, and exhaust duct assembled.
∗∗
Fully composite, conformal, baffled fuel cells assembled and installed.
∗∗
Complete hardware pack with highest quality items included.
∗∗
Complete fuel system hardware, including hopper tank, clunks, fuel tubing and Tee’s !
∗∗
.... and too much more to list !
There is no doubt that you can finish the assembly and gear installation and have the Lightning
ready to fly in 3 - 4 days, and we did this just to check it was possible. Virtually all you have to
do is install your R/C, landing gear and turbine and go and punch some holes in the sky.
For sure this has to be the most prefabricated large-scale jet you can get for your $$ !
8
(above) The Vertical fin with cnc milled internal
structure and carbonfibre spar tube, ready for
joining.
(right) A general view of the complete ducting
system. The bypass, tanks and inlets are already
installed for you - so is how the fuselage looks
5 minutes after you open the kit box !
Содержание Ultra Lightning
Страница 1: ...C A R FMo d e l s U l t r aL i g h t n i n g I n s t r u c t i o nMa n u a l...
Страница 36: ...35 above Fuselage hardware bag above Wing hardware bag above Kit Contents...
Страница 37: ...36 above Stabiliser hardware bag above Wood and Phenolic parts bag above Vertical Fin hardware bag...