docs.carbide3d.com
10/02/2020
Version 1.0
14
Install the Drag Chain to the X-
and Y1-Rails
Required Components:
Item
Description
Qty
O
M3 × 6mm Flat Head Screw
2
R
M3 × 8mm Flat Head Screw (Replacement)
2
S
M3 Nyloc Nut (Replacement)
2
1.
Position the X-rail to the back of the machine.
2.
Lay the drag chain on the rails. See
Fig. 10
.
a.
First, place the three cables not threaded
through the X-Axis drag chain (the Y-Axis
proximity switch cable and the Y1- and
Y2-motor leads) over and behind the
X-rail.
b.
Second, lift the drag chain and place it
across the Y1- and X-rails.
c.
Lay the drag chains so that the tail of the
Y-Axis drag chain will curl under and the
head of the X-Axis drag chain will curl up.
3.
Secure the drag chain to the rails, but leave the
X-Axis drag chain head disconnected for now. See
Fig. 11
.
a.
Secure the head of the Y-Axis drag chain
to the head bracket on the outside of the
Y1-carriage.
i.
Use a 2mm hex key, needle nose
pliers, two (2) M3
×
8mm FHS, and
two (2) nyloc nuts to secure.
b.
Secure the tail of the Y-Axis drag chain to
the tail plate next to the Carbide Motion
Board enclosure.
i.
Curl the tail of the drag chain
under and toward the enclosure.
ii.
Use a 2mm hex key and one (1)
M3
×
6mm FHS to secure.
c.
Secure the tail of the X-Axis drag chain to the tail plate near the Y1-motor.
i.
Use a 2mm hex key and one (1) M3
×
6mm FHS to secure.
Figure 10
Figure 11