11
1
4
Step One
Insert the dowelled fixing bracket
[GPFIX10]
into the pre-drilled unit
side gable and screw into place.
2
5
Step Five
Fit end caps if required.
3
NOTE:
1mm spacing
must be taken
into account
when cutting
down the rail.
Step Four
The rail is now secured in place.
Step Two
Slide the locking devices onto the rail.
Step Three
Sit the rail onto the routered gable
end and slide the locking device into
the fixing bracket.
Содержание VERSE
Страница 1: ...VERSE TECHNICAL GUIDE ...
Страница 3: ...3 01 BASE UNITS 01 BASE UNITS IMAGE JUKO MATT ASH BRAVA BLACK MARBLE ...
Страница 4: ...VERSE TECHNICAL GUIDE 4 4 2 1 3 IMAGE EPOS NATURAL OAK ZETA MATT GRAPHITE ...
Страница 6: ...VERSE TECHNICAL GUIDE 6 5 7 IMAGE EPOS NATURAL OAK ZETA MATT GRAPHITE 6 ...
Страница 10: ...VERSE TECHNICAL GUIDE 10 01 BASE UNITS 03 BASE UNITS FITTING GUIDE IMAGE JUKO MATT ASH BRAVA BLACK MARBLE ...
Страница 12: ...VERSE TECHNICAL GUIDE 12 01 BASE UNITS 04 WALL UNITS IMAGE ZETA GLOSS YALE GREY ...
Страница 16: ...VERSE TECHNICAL GUIDE 16 01 BASE UNITS 06 TALL UNITS VERTICAL SINGLE PROFILE IMAGE ZETA MATT GRAPHITE CASHMERE ...
Страница 18: ...VERSE TECHNICAL GUIDE 18 01 BASE UNITS 07 VERTICAL RAIL FITTING GUIDE IMAGE EPOS SLATE JUKO MATT CLOUD ...
Страница 20: ...VERSE TECHNICAL GUIDE 20 01 BASE UNITS 08 VERTICAL RAIL APPLIANCE FILLERS IMAGE ZETA MATT DUST GREY WHITE ...