Please keep this instruction manual for future reference
Instruction manual VAP2/3IN1, VAPQ2/3IN1, JOY3IN1
13
11. Connect the boiler to the power supply.
(PLEASE ENSURE THE BOILER TANK IS FULL OF WATER BEFORE SWITCHING ON,
ANY DAMAGED CAUSED BY NOT FOLLOWING THIS INSTRUCTION WILL NOT BE
COVERED BY THE GUARANTEE).
12. Test the dispenser. Adjust the temperature of the boiler to the highest setting, wait for 10
minutes until you can hear the water boiling. The ‘
HEATING’
light will illuminate whilst the
boiler is heating. Once it has reached the desired temperature,
‘READY’
will be displayed.
NOTE:
It may take a few seconds for the water to begin to flow as it makes the way up the tube (the time
will vary depending on the length of the tube). Always allow the water to run for a few seconds
before using the steaming water to make a drink. This will ensure any water which may have
cooled in the tube has been expelled first, allowing for a steaming hot beverage to be made.
To fix the boiler to the cabinet, remove the hanging plate from the packaging:
»
Mark the fixing location of the hanging bracket on the inside of the cabinet and install the
bracket fixing screws into the cabinet.
»
Using the nut and thread on the top of the boiler, fit the bracket.
»
Fix the boiler in position by locating the bracket on the screws previously fixed into
the cabinet.
»
Tighten all screws to securely fix in place.