Instruction manual FSCHSS9
12
Please keep this instruction manual for future reference
I N S TA L L AT I O N M E T H O D 2 :
-
Drill 4 holes of 6mm diameter at the bottom of the hanging cupboard.
-
Attach the one way valve to the cooker hood, then install the cooker hood onto the bottom of
the cupboard, tighten the hood with the 4
screws supplied.
N O T E :
-
The ducting tube is not supplied with the extractor.
-
Take off the protective film before installation.