56
Step 10.2
Install short bar cable
Install the short bar cable (53) by tighten one end (with screw) with back up horizontal
tube(43) at point START. Follow up the arrows direction, Pull down the cable,and through the
back sliding sleeve barbell plate hang bar (41)‘s pulley. Bring small pulley (59) to assemble with
cylindrical inner hexagon (60), flat washer (8) , nylon nut (10) on back up horizontal tube (43)
and pull up the cable from front to back.
Bring 2 way pulley (58) and have the cable go through middle of 2 way pulley (58), and pull upwards,
leave some cable (as shown in picture).
Have the cable go through the top of position “pulley 3 “and “pulley 4”. and pull down through
the hole of ,back up horizontal tube (43) and through the hole of pulley fixed tube (40) and down
to pulley 5 front, then fix the cable end with limit screw (62) and nylon nut (63) and short bar (54) together.
Содержание 10032055
Страница 1: ...10032055 Smith Machine ...
Страница 6: ...6 Montage Schritt 1 13 9 2 8 10 11 5 4 3 12 14 10 8 7 4 6 1 B 8 8 ...
Страница 8: ...8 Schritt 2 6 10 8 16 17 6 8 10 10 8 6 15 6 10 8 8 8 ...
Страница 10: ...10 Schritt 3 5 19 18 21 8 20 16 ...
Страница 12: ...12 Schritt 4 6 8 23 24 10 22 25 4 11 7 14 9 12 5 10 8 C 8 8 8 4 ...
Страница 14: ...14 Schritt 5 8 8 10 6 6 6 8 10 15 6 8 10 16 27 10 8 8 8 6 8 ...
Страница 16: ...16 Schritt 6 16 5 8 19 20 21 28 ...
Страница 18: ...18 Schritt 7 A B 33 32 35 31 8 36 4 3 3 37 19 19 36 37 34 34 34 34 8 8 8 8 SOCKET HEAD W NP 34 8 ...
Страница 20: ...20 Schritt 8 41 38 39 28 8 10 40 42 31 8 38 ...
Страница 24: ...24 Schritt 10 1 56 56 8 8 57 57 27 17 49 49 START START END END Rolle 2 Ende Ende Rolle 1 ...
Страница 26: ...26 Schritt 10 2 53 10 8 8 60 59 58 41 62 63 54 Pulley 3 END Pulley 4 START Pulley 5 43 40 Rolle 3 Rolle 4 ...
Страница 30: ...30 55 57 62 63 61 Ausschnitt Hersteller CHAL TEC GmbH Wallstr 16 10179 Berlin ...
Страница 35: ...35 Installation Step 1 13 9 2 8 10 11 5 4 3 12 14 10 8 7 4 6 1 B 8 8 ...
Страница 37: ...37 Step 2 6 10 8 16 17 6 8 10 10 8 6 15 6 10 8 8 8 ...
Страница 39: ...39 Step 3 5 19 18 21 8 20 16 ...
Страница 41: ...41 Step 4 6 8 23 24 10 22 25 4 11 7 14 9 12 5 10 8 C 8 8 8 4 ...
Страница 43: ...43 Step 5 8 8 10 6 6 6 8 10 15 6 8 10 16 27 10 8 8 8 6 8 ...
Страница 45: ...45 Step 6 16 5 8 19 20 21 28 ...
Страница 47: ...47 Step 7 A B 33 32 35 31 8 36 4 3 3 37 19 19 36 37 34 34 34 34 8 8 8 8 SOCKET HEAD W NP 34 8 ...
Страница 49: ...49 Step 8 41 38 39 28 8 10 40 42 31 8 38 ...
Страница 53: ...53 Step 10 1 56 56 8 8 57 57 27 17 49 49 START START END END ...
Страница 55: ...55 Step 10 2 53 10 8 8 60 59 58 41 62 63 54 Pulley 3 END Pulley 4 START Pulley 5 43 40 ...
Страница 57: ...57 Step 10 3 26 55 57 58 57 27 17 START END 26 62 63 61 55 57 58 57 Partial View B 17 START 26 ...
Страница 60: ...60 Manufacturer CHAL TEC GmbH Wallstr 16 10179 Berlin Germany ...