48
Step 7
In order, fix barbell set(35),back bottom link tube(31),back up link tube(33),front up link tube (32).As the
picture, and choose the corresponding screw group(37,36,34,8) to fasten
1. Put barbell set (35) into barbell sleeve(19) .Fix hexagon socket screw (37) and flat washers (36) at
both end sides.
2. Put back bottom link tube (31) to main frame assembly drawing-right(A)and main frame assembly
drawing-left(B),(as shown in the picture). Fix cylindrical inner hexagon socket screw(34) and flat
washers (8) at both end sides (2 screws on each side).
3. Put back up link tube (33) (The location is shown in the picture), fix cylindrical inner hexagon socket
screw (34) and flat washers (8).
4. Fix front up link tube (32) (The location is shown in the figure) by fastening cylindrical inner hexagon
socket screw (34) and flat washers (8).
Содержание 10032055
Страница 1: ...10032055 Smith Machine ...
Страница 6: ...6 Montage Schritt 1 13 9 2 8 10 11 5 4 3 12 14 10 8 7 4 6 1 B 8 8 ...
Страница 8: ...8 Schritt 2 6 10 8 16 17 6 8 10 10 8 6 15 6 10 8 8 8 ...
Страница 10: ...10 Schritt 3 5 19 18 21 8 20 16 ...
Страница 12: ...12 Schritt 4 6 8 23 24 10 22 25 4 11 7 14 9 12 5 10 8 C 8 8 8 4 ...
Страница 14: ...14 Schritt 5 8 8 10 6 6 6 8 10 15 6 8 10 16 27 10 8 8 8 6 8 ...
Страница 16: ...16 Schritt 6 16 5 8 19 20 21 28 ...
Страница 18: ...18 Schritt 7 A B 33 32 35 31 8 36 4 3 3 37 19 19 36 37 34 34 34 34 8 8 8 8 SOCKET HEAD W NP 34 8 ...
Страница 20: ...20 Schritt 8 41 38 39 28 8 10 40 42 31 8 38 ...
Страница 24: ...24 Schritt 10 1 56 56 8 8 57 57 27 17 49 49 START START END END Rolle 2 Ende Ende Rolle 1 ...
Страница 26: ...26 Schritt 10 2 53 10 8 8 60 59 58 41 62 63 54 Pulley 3 END Pulley 4 START Pulley 5 43 40 Rolle 3 Rolle 4 ...
Страница 30: ...30 55 57 62 63 61 Ausschnitt Hersteller CHAL TEC GmbH Wallstr 16 10179 Berlin ...
Страница 35: ...35 Installation Step 1 13 9 2 8 10 11 5 4 3 12 14 10 8 7 4 6 1 B 8 8 ...
Страница 37: ...37 Step 2 6 10 8 16 17 6 8 10 10 8 6 15 6 10 8 8 8 ...
Страница 39: ...39 Step 3 5 19 18 21 8 20 16 ...
Страница 41: ...41 Step 4 6 8 23 24 10 22 25 4 11 7 14 9 12 5 10 8 C 8 8 8 4 ...
Страница 43: ...43 Step 5 8 8 10 6 6 6 8 10 15 6 8 10 16 27 10 8 8 8 6 8 ...
Страница 45: ...45 Step 6 16 5 8 19 20 21 28 ...
Страница 47: ...47 Step 7 A B 33 32 35 31 8 36 4 3 3 37 19 19 36 37 34 34 34 34 8 8 8 8 SOCKET HEAD W NP 34 8 ...
Страница 49: ...49 Step 8 41 38 39 28 8 10 40 42 31 8 38 ...
Страница 53: ...53 Step 10 1 56 56 8 8 57 57 27 17 49 49 START START END END ...
Страница 55: ...55 Step 10 2 53 10 8 8 60 59 58 41 62 63 54 Pulley 3 END Pulley 4 START Pulley 5 43 40 ...
Страница 57: ...57 Step 10 3 26 55 57 58 57 27 17 START END 26 62 63 61 55 57 58 57 Partial View B 17 START 26 ...
Страница 60: ...60 Manufacturer CHAL TEC GmbH Wallstr 16 10179 Berlin Germany ...