background image

CANYON FURNITURE COMPANY

A.- (1) TOP BUNK BED

B.- (2) 4"METAL DOWEL PINS

C.- (1) LOFT DRESSER

D.- (1) LOFT DESK

E.- (1) LOFT HUTCH

B.- (2) 4"METAL DOWEL PINS

F.- (4) SIDE RAILS
G.- (2) GUARD RAILS

H.- (24) 80MM FLAT HEAD BOLTS

I.-  (24) 5/16"-18 X 5/8" CROSS DOWEL NUTS BLACK
J.- (1) 5MM ALLEN WRENCH

T.- (1) HEADBOARD
U.- (1) FOOTBOARD

V.- (4) CASTER SOCKETS

N.- (1) LADDER

O.- (2) METAL HOOK BRACKETS
P.- (6) 1" SCREWS

1.- ASSEMBLE TOP BUNK BED,USING ONE TOP BUNK BED

Q.- (4) 39", 54" SLATS

END (A), ONE LOFT DRESSER (C),OR ONE LOFT DESK (D),
2 LOFT HUTCH (E) 2 SIDE RAILS (F),&2 GUARDRAILS (G).

R.- (8) 1 1/4" SCREWS

2.- TAKE LOFT DRESSER (C ) & LOFT DESK (D ),& PLACED
THEM IN DESIRED POSITION IN THE ROOM, 

( PLACE

S.- (1) 1 PC BUNK BED END TWIN

FRONT FACE OF DESK OUTWARDS).

3.- INSERT TWO DOWEL PINS (B ) ON TOP IN EACH OUTSIDE CORNER OF LOFT DRESSER

OR LOFT DESK, TAKE THE LOFT HUTCH (E), &PLACE IT ON TOP OF LOFT DRESSER&LOFT DESK ALIGNING THE METAL DOWEL PIN WITH EACH PRE - DRILLED HOLE IN EVERY
END OF LOFT HUTCH UNTIL THE METAL DOWEL PIN ARE ALL THE WAY IN THE HOLE OF THE LOFT HUTCH, REPEAT THE SAME PROCESS WITH TOP BUNK BED (A),

(FIG.9)

4.- INSERT 2 CROSS DOWEL NUTS (I) IN ACCESS HOLE INSIDE THE SIDE RAIL&GUARD RAIL,ALIGN CROSS DOWEL NUT,MAKE SURE THE GROOVE IS HORIZONTAL, 

(FIG.10)

5.- ATTACH TWO SIDE RAILS &TWO GUARDRAILS TO DRESSER/HUTCH/TOP BUNK BED ASSEMBLY& 1 PC BUNK BED END TWIN (S), INSERTING TWO FLAT BOLST (H) INTO TOP
BUNK BED&1 PC BUNK BED END TWIN HOLES,USE ALLEN WRENCH TO TIGHTEN BOLTS,(DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER),

FIG.11

5.- PLACE FOUR SLATS (Q) ON TOP SIDE RAIL CLEATS,ONE SLAT IN BOTH ENDS,PUSH THE SLAT AGAINST THE BED END POST (FIG.A) &TWO SLATS IN THE MIDDLE AT EQUAL
DISTANCE FROM THE END SLATS, THEN EACH SLAT MUST BE FASTEN WITH TWO 1 1/4" SCREWS (S), 

SEE FIG.12

6 PIECE RAILS BOX (28-730) FIG.4

HARDWARE PACK

 

(HPK00008-0)

LADDER BOX (28-720) FIG.6

TOP BUNK BED ASSEMBLY INSTRUCTIONS  CONFIGURATION TYPE # 2

HARDWARE PACK  

(HPK00012-0)

HARDWARE PACK  

(HPK00123-0)

TOP BUNK BED BOX (28-705) FIG.1

HARDWARE PACK

 

(HPK00016-0)

TWIN/FULL SLATS BOX (100-645,100-646) FIG.7

1 PC BUNK BED END TWIN BOX (28-706) FIG.8

HARDWARE PACK  

(HPK00104-0)

HARDWARE PACK

 

(HPK00127-0)

FULL BOTTOM HDBD&FTBD BOX (28-709) FIG.5

6 DRAWER LOFT DRESSER BOX (28-207) OR

LOFT DESK BOX (28-603) FIG.2

LOFT HUTCH BOX (28-766) FIG.3

LIST OF CONTENTS

COTTAGE COLORS COLLECTION

A

B

HARDWARE PACK

HPK00123-0

FIG.1 

C

FIG.2 

S

FIG.8 

D

E

B

FIG.3 

HARDWARE PACK

HPK00012-0

FIG.4 

F

G

I

J

H

HARDWARE PACK

HPK00104-0

T

U

V

FIG.5

HARDWARE PACK

HPK00127-0

O

P

N

HARDWARE PACK

HPK00008-0

FIG.6 

Q

R

HARDWARE PACK

HPK00016-0

FIG.7 

FIG.9

FIG.10

YES,

HORIZONTAL GROOVE

NO

FIG.11

FIG.A

FIG.12

REV 02 04/02/2019

PAGE 3 OF 5

KIS01179-0

Содержание 28-705

Страница 1: ...766 LOFT HUTCH 2 PCS 28 730 6 PIECE RAILS 28 707 TWIN BOTTOM HDBD FTBD 28 720 LADDER 28 735 RAIL CAP 100 645 TWIN SLATS 2 PCS TIPS 2 OPTION 1 28 705 TOP BUNK BED 28 207 6 DRAWER LOFT DRESSER 28 766 LOFT HUTCH 28 706 1 PC BUNK BED END TWIN 28 730 6 PIECE RAILS 28 709 FULL BOTTOM HDBD FTBD 28 720 LADDER 28 735 RAIL CAP 100 645 TWIN SLATS 100 646 FULL SLATS OPTION 1 28 705 TOP BUNK BED 28 603 LOFT DE...

Страница 2: ...K BED ASSEMBLY INSERTING TWO FLAT HEAD BOLST H INTO TOP BUNK BED HOLES USE THE 5MM ALLEN WRENCH J TO TIGHTEN BOTH BOLTS DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER SEE FIG 11 REPEAT THE SAME PROCESS ON ALL FOUR CORNERS 6 PLACE FOUR SLATS Q ON TOP SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE FROM T...

Страница 3: ...WO GUARDRAILS TO DRESSER HUTCH TOP BUNK BED ASSEMBLY 1 PC BUNK BED END TWIN S INSERTING TWO FLAT BOLST H INTO TOP BUNK BED 1 PC BUNK BED END TWIN HOLES USE ALLEN WRENCH TO TIGHTEN BOLTS DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER FIG 11 5 PLACE FOUR SLATS Q ON TOP SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A TWO SLATS IN THE MIDDLE AT EQU...

Страница 4: ...INTO THE SIDE RAILS INSERTING TWO FLAT HEAD BOLTS H INTO THE HEADBOARD FOOTBOARD HOLES USE THE 5MM ALLEN WRENCH J TO TIGHTEN BOLTS UNTIL SECURE SEE FIG 2 4 PLACE FOUR SLATS Q ON SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A AND TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE FROM THE END SLATS THEN EACH SLAT MUST BE FASTEN WITH TWO 1 1 4 SCREWS R SEE FIG 3 5 INSERT ...

Страница 5: ...INST THE WALL TO PREVENT ENTRAPMENT BETWEEN THE BED AND THE WALL 12 ALWAYS USE GUARDRAILS ON BOTH LONG SIDES OF THE UPPER BUNK 13 THE USE OF WATER OR SLEEP FLOTATION MATTRESSES IS PROHIBITED 14 STRANGULATION HAZARD NEVER ATTACH OR HANG ITEMS TO ANY PART OF THE BUNK BED THAT ARE NOT DESIGNED FOR USE WITH THE BED FOR EXAMPLE BUT NOT LIMITED TO HOOKS BELTS AND JUMP ROPES 15 KEEP THESE INSTRUCTIONS FO...

Отзывы: