background image

CANYON FURNITURE COMPANY

1.- ALIGN THE PRE- DRILLED HOLES IN LONG PART OF METAL HOOKS BRACKETS (O) WITH THE PRE- DRILLED HOLES IN THE LADDER (N), SECURE WITH 1" SCREWS (P) USING

PHILLIPS HEADSCREWDRIVER 

(NOT INCLUDED)

, SEE FIG.B & HOOK THE LADDER IN THE PROPER POSITION, ADJUST AND ALIGN THE PRE-DRILLED HOLES IN THE SHORT

PART OF METAL HOOKS ON TOP GUARDRAIL AND SECURE THE LADDER, AS SHOWN IN 

FIG.13

CASTER TWIN BED BOX ( 90-707,90-709 )

CASTER TWIN BED BOX ( 90-707,90-709 )

J.- (6) 1 1/4" SCREW

1.- ASSEMBLE TWIN/FULL BOTTOM HDBD&FTBD, USING ONE HEADBOARD (K), ONE FOOTBOARD (L) AND TWO SIDE RAILS (F).
2.- INSERT TWO CROSS DOWEL NUTS (I) IN ACCESS HOLE INSIDE THE SIDE RAIL, ALIGN THE CROSS DOWEL NUT,MAKE SURE THE GROOVE IS HORIZONTAL,

SEE FIG.1

3.- ATTACH THE HDBD&FTBD INTO THE SIDE RAILS, INSERTING TWO FLAT HEAD BOLTS (H) INTO THE HEADBOARD &FOOTBOARD HOLES, USE THE 5MM ALLEN WRENCH (J) TO
TIGHTEN BOLTS UNTIL SECURE, 

SEE FIG.2

4.- PLACE FOUR SLATS (Q) ON SIDE RAIL CLEATS, ONE SLAT IN BOTH ENDS, PUSH THE SLAT AGAINST THE BED END POST 

(FIG.A)

 AND TWO SLATS IN THE MIDDLE AT EQUAL

DISTANCE FROM THE END SLATS, THEN EACH SLAT MUST BE FASTEN WITH TWO 1 1/4" SCREWS (R), 

SEE FIG.3

5.- INSERT THE CASTER SOCKETS (M) INTO BOTTOM CORNERS OF THE HEADBOARD&FOOTBOARD, 

SEE FIG.C

6.- ROLL THE TWIN/FULL BOTTOM HDBD&FTBD&PLACE IT BETWEEN LOFT DRESSER/HUTCH/TOP BUNK BED &LOFT DESK/HUTCH/TOP BUNK BED OR 1 PC BUNK BED END TWIN

AS SHOWN IN

 ALL OPTIONS

K.-  (1) 3 DRAWER NIGHT STAND

LADDER ASSEMBLY INSTRUCTIONS

O.- (4) METAL CASTER SOCKET

TWIN/FULL BOTTOM HDBD&FTBD ASSEMBLY INSTRUCTIONS

N.- (1) CASTER BED FOOTBOARD

M.- (1) CASTER BED HEADBOARD

YES,

HORIZONTAL GROOVE

FIG.1 

NO

FIG.2 

FIG.3 

FIG.C 

FIG.13 

FIG.B 

FIG.A

REV 02 04/02/2019

PAGE 4 OF 5

KIS01179-0

Содержание 28-705

Страница 1: ...766 LOFT HUTCH 2 PCS 28 730 6 PIECE RAILS 28 707 TWIN BOTTOM HDBD FTBD 28 720 LADDER 28 735 RAIL CAP 100 645 TWIN SLATS 2 PCS TIPS 2 OPTION 1 28 705 TOP BUNK BED 28 207 6 DRAWER LOFT DRESSER 28 766 LOFT HUTCH 28 706 1 PC BUNK BED END TWIN 28 730 6 PIECE RAILS 28 709 FULL BOTTOM HDBD FTBD 28 720 LADDER 28 735 RAIL CAP 100 645 TWIN SLATS 100 646 FULL SLATS OPTION 1 28 705 TOP BUNK BED 28 603 LOFT DE...

Страница 2: ...K BED ASSEMBLY INSERTING TWO FLAT HEAD BOLST H INTO TOP BUNK BED HOLES USE THE 5MM ALLEN WRENCH J TO TIGHTEN BOTH BOLTS DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER SEE FIG 11 REPEAT THE SAME PROCESS ON ALL FOUR CORNERS 6 PLACE FOUR SLATS Q ON TOP SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE FROM T...

Страница 3: ...WO GUARDRAILS TO DRESSER HUTCH TOP BUNK BED ASSEMBLY 1 PC BUNK BED END TWIN S INSERTING TWO FLAT BOLST H INTO TOP BUNK BED 1 PC BUNK BED END TWIN HOLES USE ALLEN WRENCH TO TIGHTEN BOLTS DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER FIG 11 5 PLACE FOUR SLATS Q ON TOP SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A TWO SLATS IN THE MIDDLE AT EQU...

Страница 4: ...INTO THE SIDE RAILS INSERTING TWO FLAT HEAD BOLTS H INTO THE HEADBOARD FOOTBOARD HOLES USE THE 5MM ALLEN WRENCH J TO TIGHTEN BOLTS UNTIL SECURE SEE FIG 2 4 PLACE FOUR SLATS Q ON SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A AND TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE FROM THE END SLATS THEN EACH SLAT MUST BE FASTEN WITH TWO 1 1 4 SCREWS R SEE FIG 3 5 INSERT ...

Страница 5: ...INST THE WALL TO PREVENT ENTRAPMENT BETWEEN THE BED AND THE WALL 12 ALWAYS USE GUARDRAILS ON BOTH LONG SIDES OF THE UPPER BUNK 13 THE USE OF WATER OR SLEEP FLOTATION MATTRESSES IS PROHIBITED 14 STRANGULATION HAZARD NEVER ATTACH OR HANG ITEMS TO ANY PART OF THE BUNK BED THAT ARE NOT DESIGNED FOR USE WITH THE BED FOR EXAMPLE BUT NOT LIMITED TO HOOKS BELTS AND JUMP ROPES 15 KEEP THESE INSTRUCTIONS FO...

Отзывы: