![Cantiere Del Pardo Grand Soleil 46.3' Скачать руководство пользователя страница 80](http://html1.mh-extra.com/html/cantiere-del-pardo/grand-soleil-46-3/grand-soleil-46-3_owners-manual_3959869080.webp)
Waste water drainage from shower and sinks
25.
1
Grand Soleil 46.3'
C
H
A
P
T
E
R
25
Waste water drainage from shower and sinks
Shower waste water drainage installation
◊
The shower water-collecting basins, located below toilet grating,
are drained out by the electric bilge pumps fitted with filter on the
intake.
◊
The control switch to the pump is the
BILGE PUMPS
which is located
in the
PUMPS
section of the 12 V
DC
Functions Panel (§ pages
7
.5 &
7
.6) whereas actual switches are in the front side of the sinks in the
heads.
◊
The two electric pumps for draining the showers are located as
follows (§ page
27
.6):
• For the fore head
under the central sit of the saloon, next to the fresh water pump.
• For the aft head
in the front part of the engine compartment.
• While showering or after, always drain water out of the basin by
activating electrical pump.
• Drainage of the pumps flows into drainage collector located in aft
port peak (§ page
27
.1).
Waste water drainage operations are as follows:
◊
Before entering the shower, select the shower bilge aspiration
valves as follows:
• For the shower in the fore head, on the collector C under the
central sit of the saloon open the valve (
C
4) and close the other two
(
C
2 and
C
3).
• For the shower in the aft head, on collector D in the left front part
of the engine compartment open valve (
D
2) and close the other two
(
D
3 and
D
4).
• Turn on the
BILGE PUMPS
switch which monitors electrical pump.
It is located in 12 Vdc Functions Panel. This switch monitors the
local switches located in the toilets.
• Leave on the above monitor switch for all the duration of the
shower and turn on the actual switches next to the shower until
waste water has been completely drained out.
Содержание Grand Soleil 46.3'
Страница 1: ...Grand Soleil 46 3 Owner s Manual...